As we go into winter mode, I have decided to at least log on the majority of the report I send to the board every month. This way, even if I run out of time to write updates, our remote friends and visitors will have a bit of information.
In adfor a dition, we hope to have the Yard 5 set open for volunteers during the Holiday train event. While it is not planned as a public area, our friends will have a place to go for a cup of coffee or tea or cocoa, and a place to "set a spell".
GENERAL DEPARTMENT PROGRESS
The month of October was spent mostly supporting Terror on the Railroad.
The screamliner set was successful, and we encountered no significant mechanical issues throughout.
The wheel switch on the CRIP coach is delayed until spring, and expenses estimate is included in the 2010 budget.
We hope to complete several projects this winter, as well as awaiting the completion of Barn 11.
CBQ 993, a Havelock built baggage car is now en route, having left St Louis 11-8 via UP through Pekin and Proviso.
CBQ 1309, a baggage car owned by IRM at least since 2001, has been located recently and we have begun to inquire about the method of movement to finally get it home. Info coming from the Executive Director includes availability of a flat car in the area. A crane service has been identified by the Colorado Railroad Museum as someone they know. We project making progress on this car over the winter and hope to move it in early 2010.
INDIVIDUAL EQUIPMENT REPORTS
DLW coaches (3)
Two cars are service.
The third car is still undergoing required structural welding. The repairs are now progressing, with deck plates being installed.
Glen Springs
Roger Kramer has made significant progress on the car. Batteries have been reinstalled, and basic electrical function of the car has been reactivated. Exterior cabinet doors have been reattached, and latch mechanisms have been restored.
ATSF 2544
One side of the coach area has now been installed, and the second side of “modern” seats is being removed, to allow for completion of the area for spring. All seat frames are now located, and the prep work on the second set will be conducted over winter.
http://www.irm.org/gallery/ATSF2544
John McGloughlin
Interior restoration continues, as well as metal and paint work on one vestibule
Dover Strait
Most interior painting is complete, with some ceiling to be completed in spring. Light fixtures were removed and refinished, now being reinstalled.
B&M 3288/1094
No significant changes, beyond the continued progress. Jack continues on the coach area of the car. Windows are reinstalled. Seat frames are being located and installed. We await the assistance to use the forklift and retrieve the steps from the material yard. Once they are located behind the barn, prep work can begin.
RDC 9933
We have begun to disassemble more seating for repairs.
We have also disassembled one bathroom wall, to restore the proper doorway.
Our off season restoration plans include further repairs to baggage rack lighting circuits, as well as a planned spring effort to repair the secondary air circuit to provide interior brake control as well as a horn.
http://www.irm.org/gallery/CNW9933
CBQ Silver Ridge
Electrical conversion of low voltage DC fixtures has been completed
We are proceeding to backdate some of the bedrooms to original salmon
In addition the hope is to continue to backdate more bedrooms and bathrooms to original CBQ colors.
ACL Birmingham
The kitchen has some backdating to be done, but it will take a secondary role as we focus on Silver Ridge and the ventilation system.
Comments
Sun, 05-19-2013 22:13
Hello again. I had an idea that was (somewhat rudely, mid-sentence) dismissed in talking to a museum volunteer a few years back, but here it goes [...]
Thu, 05-16-2013 21:52
Looking good Bob! I hope to come out soon once I'm done with school.
Wed, 05-15-2013 21:28
I was not around at the time. General discussion suggests that it was "pretty marginal" in a number of areas. Nigel
Mon, 05-13-2013 11:08
"THUMBS UP!"
Fri, 05-10-2013 02:15
No, it will not be necessary to hold any of the work waiting for the plow to be turned, end for end. Weather will be the major factor, but there will [...]
Thu, 05-09-2013 19:54
The CGW X-38 plow is really coming to life. Bob Kutella and Vic and crew need to be very proud of your collective efforts. I am very appreciative of [...]
Thu, 05-09-2013 15:20
The snowplow looks great! Are you going to apply the door and upper windows befor it is turned to continue work?
Thu, 05-09-2013 09:09
Max, Is there any progress to report yet, in regards to the installation of the poles and overhead wires? Have a good day, sir.
Wed, 05-08-2013 18:40
Thanks for the update! I still don't understand why Commonwealth #5 was removed from service. Do you know why?
Tue, 05-07-2013 09:28
Mr. Kolanowski.....I was just wondering if the Spaulding webcam will be up and running soon for us stay-at-homes. Thanks!2FP
Mon, 05-06-2013 23:04
Max, Has work begun yet on the construction phase of erecting the poles and putting up the wire? Wish I could be there to watch it happen.
Mon, 05-06-2013 23:02
Keep up the good work, Bob. Wish I could be there to help!!!!!!!