GENERAL DEPARTMENT PROGRESS
Much of the past few weeks has been spent on housekeeping and organizing. Mike, Ray and Marc spent last Sunday clearing up the east end of Barn 3 to make it presentable for the public in two weeks.
With the Villa Falls and Floyd River indoors finally, we have begun to actually get our parts collection organized as well.
Signage is being created and installed on all passenger cars not open for visits.
New information is being compiled to request info signs for equipment now in public areas.
Support for early season special event days is being planned.
We continue to spend time performing bench repairs on some spare parts for the collection, and further organizing our parts inventory for the future.
With the budget approved, the wheel switch on the CRIP coach remains a plan for spring.
CBQ 1309, a baggage car owned by IRM at least since 2001, (and the baggage mate to our CBQ1923 RPO), remains an intended project.
We await progress. The Executive Director has related a stop during the current road trip, and perhaps an inquiry of the information necessary to get this car home.
INDIVIDUAL EQUIPMENT REPORTS
DLW coaches (3)
No changes as of yet
Two cars are in service.
The third car is still undergoing required structural welding, but finally nearing completion. The platform is in place, and the door and frame have been remounted.
CBQ RPO 1923
Progress is being made towards an enhanced event. We also hope to have the car participate in the Memorial Day train, as part of the WWII reenactment.
ATSF 2544
The prep work for the second side of seats has continued.
Seat frames are being prepared and the wall work nears completion, with paint work being done now.
Dover Strait
Progress continues piecemeal, as reassembly of the lounge area continues. Corridor painting continues, and hardware installation also continues. The plan is to utilize exterior time during May/June switching in Barn 3 to get the undercarraige painted, and then have it placed in a position to offer interior inspections as well as enhanced exterior visibility.
B&M 3288/1094
No significant changes, beyond the continued progress. Part of the plan for spring includes the possible move of the car to a location where exterior work can be done.
DMIR 84
Window Frame repairs continue
Yard 5 display
RDC 9933
Brake cylinders are being disassembled and rebuilt to ensure long term function of the car.
Seat frame repairs are nearing completion.
Final baggage rack area has been reinstalled, and lights rewired.
CBQ Silver Ridge
While we have not had a lot of time in this car, some backdating has been accomplished, and we still hope to have more done for the 2010 season.
Roomette sink hardware has been located and installed.
light fixtures are being explored to possibly replace more missing pieces.
Comments
Mon, 06-17-2013 09:50
Wish I could be there to help.
Fri, 06-14-2013 16:50
Matthew, Any special event is the decision of the museum Board. My personal opinion is that it is likely that there would be a special event to [...]
Thu, 06-13-2013 18:33
Hi, I have a question, if or when she is restored and back up and running this or next year. Will their be a special event set up for the return of [...]
Tue, 06-11-2013 22:36
The whistle 1630 wore for a while that you're thinking of was a Frisco 6 chime donated by a former member of the steam shop. It was on it a few times [...]
Tue, 06-11-2013 18:03
You are talking here about something well before my time !. I have not seen her with anything other than the whistle she now carries. If she [...]
Mon, 06-10-2013 16:17
i'm curious here. Will 1630 ever wear the ATSF 6 chime she had on for a while? Better defines her, I love the deep whistle she has now but the higher [...]
Sat, 06-08-2013 15:15
Many many many many many thanks for getting the Spaulding webcam working!!!!!
Fri, 06-07-2013 16:55
The donation was to the museum as a whole. How it is used and whether any comes to steam department projects will be the decision of the museum [...]
Fri, 06-07-2013 16:53
Basically the plan is "ONLY" reassembly. As far as we know she is is reasonable mechanical shape. The big mechanical problem that stopped her (slack [...]
Fri, 06-07-2013 16:28
Nigel I read you guys got a one million dollar check donation!!! Will this be used to finish 1630 ,428, 5 and get started on the others next in line?
Fri, 06-07-2013 16:16
So does 1630 basically only need reassembly? With the boiler in particular. Does her tender or running gear need any work before she's ready for the [...]
Fri, 06-07-2013 12:00
Hello.. The voltage we are using and presumed the RR also used is 120 vac. The system is a little unique because the lite bulbs are each 60 volts. [...]