Here is an update submitted by Roger Smessaert. It seems that the extent of the damage was far wider than we first noted, and there was additional storm related damage.
***********
Max T the IRM Electrical Czar called me tonight at 10pm from his motel in Dwight IL to give me a status report.
First, Max got the report that Tim Peters had checked voltage in barn 8 and found a nominal 600 VDC reading inside the barn (with the switch being blown open). Max felt that was alarming so he looked into it as soon as he could. The short story is.... yes the inside was alive at 600VDC. Max disconnected some tap wires and found the Track 82 NoBo section insulator had been punctured by lightning and was the source problem. To isolate the feed to the section insulator he removed the tip and tied the trolley wire back in the clear. If Track 82 is used you will have to hop the trolley wire past the insulator until it is fixed.
Max talked to Gerry Dettloff and they felt that a stinger could be used to liven any track needed to pull equipment in/out with caution of course.
Next the many transformer cutouts (fuses) were dealt with. Barn 6 & 7 are all closed and re-energized with service restored.
Barn 8 has several issues that require further repairs. Starting with the transformer bank, the lightning arrestor is shorted and needs to be replaced. The 3 phase transformer is burned out and requires being replaced. The transformer primary bushing was shattered (and scattered) by the lightning. The neutral conductor of the 3 phase service from the transformer to the lighting panel (via the service entrance cable) is annealed and requires replacement before service can be restored. The ground wire from the lighting panel to a driven ground will have to be replaced. It is also annealed and the diecast conduit connector to the panel board is burned.
See Jamie K's excellent selection of photos of the equipment damage at this link: http://www.irm.org/gallery/barn8damage-06232010 .
All in all a lot got done today. In addition to the above work on the barn outages. Max also restored the mainline signal system. A primary fuse on the mainline east of the sub was blown by the storm Saturday night. 65 amp fuse - possibly tree contact east of Karstens is the usual suspect.
And ALSO, the carline was reopened after the whacked steel pole on the S curve was straightened and anchored and the span wire re-attached.
Max reports he really enjoyed the day of troubleshooting the IRM multiple problems from the storm damage. He sure had a busy day and was very productive. He worked until 6pm then drove to his motel in Dwight, IL to prepare for a new week on his recent "real job" at Ransom, IL.
Roger Smessaert -reporter
Comments
Sun, 05-19-2013 22:13
Hello again. I had an idea that was (somewhat rudely, mid-sentence) dismissed in talking to a museum volunteer a few years back, but here it goes [...]
Thu, 05-16-2013 21:52
Looking good Bob! I hope to come out soon once I'm done with school.
Wed, 05-15-2013 21:28
I was not around at the time. General discussion suggests that it was "pretty marginal" in a number of areas. Nigel
Mon, 05-13-2013 11:08
"THUMBS UP!"
Fri, 05-10-2013 02:15
No, it will not be necessary to hold any of the work waiting for the plow to be turned, end for end. Weather will be the major factor, but there will [...]
Thu, 05-09-2013 19:54
The CGW X-38 plow is really coming to life. Bob Kutella and Vic and crew need to be very proud of your collective efforts. I am very appreciative of [...]
Thu, 05-09-2013 15:20
The snowplow looks great! Are you going to apply the door and upper windows befor it is turned to continue work?
Thu, 05-09-2013 09:09
Max, Is there any progress to report yet, in regards to the installation of the poles and overhead wires? Have a good day, sir.
Wed, 05-08-2013 18:40
Thanks for the update! I still don't understand why Commonwealth #5 was removed from service. Do you know why?
Tue, 05-07-2013 09:28
Mr. Kolanowski.....I was just wondering if the Spaulding webcam will be up and running soon for us stay-at-homes. Thanks!2FP
Mon, 05-06-2013 23:04
Max, Has work begun yet on the construction phase of erecting the poles and putting up the wire? Wish I could be there to watch it happen.
Mon, 05-06-2013 23:02
Keep up the good work, Bob. Wish I could be there to help!!!!!!!