Sunday, March 27. 2011Track Report
First off - not a single photo was taken this weekend, we were all just too busy.
Saturday was a productive day, Adam was a surprise visitor as he had some things to take care of up north for a day, so he joined Frank and we always can use the added help. Frank and Adam worked together taking care of joint repairs, marking ties, fixing one of two pull apart, cleaning the ROW and starting the process of switch lube - all from the Santa Fe hyrail truck. I spent the entire day setting out ties from the big tree to the east end of Johnson, picking up where Jeron left off - the CN gon never arrived of course - we worked until well after dark to get it all done. Sunday was just Mitch and I doing some machine repairs - we pulled the bottom bearing from the mower side bar, and cleaned it up in the car shop. We found out why the bolts broke - the bearing is worn out and caused the housing to wobble breaking the bolts. As it is in a trapped hanger, Mitch and I put it all back together without the bolts (that have been broken for years) and fired it up after sitting by Yard 3 all winter - the mower is now back in machine row at Yard 11. I plan to run it on the ROW some next weekend. We spent some time in the Industrial Brownhoist crane with the steam shop folks who are making it ready for service for the Barn 23 track project. We got a plan together for changing out some grease fittings and will get that one ready in the next few weekends as well. Over the next week Jeron will get the 4 inch long sweep exhaust 90 deg bend for the 50 and we can get that installed - as the CN gon was a no show on Sunday too... soon enough we need to be ready to unload it. A productive weekend for sure - Be Safe out there Tom Sunday, March 20. 2011Weekend Track Report
Long Days and tons of work done... well how about one long day and a day to watch thunderstorms and do some flat car planning...
This weekend we continued where Adam and Jeron had left off the week before, we set up the crane train and set off the last of the tie bundles. It was a long day of hard work - and we were joined by more new folks - and Patrick who it appears that we did not scare off (yet). We were also joined by Mike Potter - it was good to see him out for a day, and good to have him along to make the cuts and couple back up every time we have to set off a bundle close to the crane - as you cannot raise the boom under the wire - For the gang we had Adam for his last day of spring break, Frank, New guy Bill and Patrick - we also had Greg from the electric car join us and of course Mike Potter. At the end of the day Steve joined us as a ground man fresh from the new CP UTU rank. While the gang unloaded the ties between Johnson and the Farm Crossing - Adam spent the day spotting the ties where marked - about 400 of them. We have about 300 more to spot. Frank started marking the rest of the bad wood - and Jeron will dig into the tie crane to spot the rest this week. We hope to get the tie gang out in a month or less to get this done - then we have all the mess of the old ties to pick back up. As soon as we had the last ties off the car, we took a bit of time to set some signal heads with the crane while we were out at Johnson - have to use all the equipment as much as we can for each other. We worked so hard that we did not take any lunch time until after 3P - as we wanted to get all the ties out and give the railroad to the electric car department to train on the CA&E trains. After lunch we set the TTX car back on the interchange and a few of us finished the day off with some scrap loading into the gon with the mag to pick up some more of the scrap around the place. Sunday tuned out to be really rainy with thunderstorms - as we had so much under our belts by then, Frank - Jeron and I just spent some time talking the rest of the summer plans watching the show from Barn 2 - Next weekend the inbound CN OTM car unloading will be the show (if it is here). Be Safe out there Tom Monday, March 14. 2011Sunday's Track ReportRiding on the success of yesterday's progress today our two goals for the day were to clean a few machines with the pressure washer, and unload the ties loaded onto the flatcar yesterday along the mainline. The short version of the story is that both jobs were completed but not without a little excitement in between. The crew today was myself, Tom Hunter, Jeron Glander, and a new volunteer, Patrick Shea. We started right away with the rented 3000psi heated pressure washer and cleaned up the tie crane, regulator and Model 50 Burro crane. After cleaning the radiators on the burro it ran significantly better now that it has proper air flow drastically minimizing the possibility of overheating the engine. We picked up our loaded flat car of ties and the EJ&E 529 caboose and headed out onto the carline. The rest of the day was spent unloading around 400 ties along the mainline. Tom expertly ran the crane while Jeron, Patrick and myself hooked and unhooked the bundles along the line, mostly between Seeman Rd and Four Mile Siding. We'll come back out with the tie crane sometime soon and distribute the ties where they'll be installed. It was an incredibly productive day and called it quits after tying up shortly before sunset in Yard 11. This week the rest of the ties (~250) should get loaded onto the flatcar which should allow us to repeat the job again next weekend. Thanks again to Patrick for joining us for a second day in a row. Hope we didn't scare him away. Adam RobillardIRM Track Dept Sunday, March 13. 2011Saturday Track Report
Saturday's plan involved a two pronged attack. One group was to finish walking the mainline, the second team was to load the mainline ties onto a flatcar, so they can be peddled out for install in the coming weeks.
Again, I picked up Marcus at Aurora Transportation Center, and we drove up to Marengo Cafe for breakfast. After Breakfast we met a new volunteer to our group, Patrick Shea. Adam joined us at the caboose on 110 track and the plans were set in motion. Marcus and I walked track. We started with the stretch from East switch to Karstens, so the diesel department could use the east switch as head room for fueling diesels. We then continued out to signal 201 with no significant defects found. The walk continued from East switch to West before we broke for lunch. After lunch we finished off the West end finding one broken bar. The total repairs for this spring, two pull aparts east of 4 mile siding, which is still out of service, One broken bar on the main between 201 and 251. One broken bar at West switch. We intend to have the two broken bars fixed before the start of the season. The pull aparts depend on getting some warm sunny weather to get the rails to expand enough to get new bolts in the rail. Adam and Patrick grabbed the fork lift and started loading bundles of ties onto the TTX flat car that the Camp Grant arrived on. All the other IRM flats are in use, so we pressed this one into service since it was just taking up space in the siding. The diesel department was kind enough to retrieve it and bring it to along barn 9 for us. In short order Adam and Patrick had the flat loaded up and ready for Sunday's distribution party. A break for a brief meeting, and we were back at it putting the train together. Tom joined us for this phase of the job. Tom finished off getting the four part hook put back on the crane. The hook was taken off last year to rig up the clam shell for loading stone. Tom, Marcus, and I, then got the 529 caboose moved over and the loaded flat car onto track 112, while Adam and Patrick loaded a couple more bundles of ties onto tie flats with the tie crane. The tie crane was tied down in yard 10 for the night. Tomorrow's projects, go out and peddle ties where we marked ties for replacement. A few photos have been posted here: http://www.irm.org/gallery/album271 Frank D. Saturday, March 5. 2011Saturday's Track Report
Today unofficially marked the beginning of 'the busy season' by inspecting the first portions of the mainline for its return to revenue service in the coming weeks.
Food started off the morning in Marengo with Frank Devries and myself. After arriving to the property we were joined by Bob Olson and began walking track from Seeman Rd working East. The priority was to walk and mark ties to be replaced this year as well as inspect for the usual defects; joint bars, bolts, breaks, culverts and anything else that isn't quite right. We walked a few hours before calling it lunch at Subway. Tom Hunter met us there and we were off for a few more hours of inspection. We officially walked from Signal 201/202 all the way to the east end of the line. A few hard miles in full winter gear. Totals from the day include 387 ties marked for renewal between West Switch Johnson to Four Mile Siding (+ a few more not yet marked), one center broken joint bar and two pull aparts. At least another 100 ties will be marked once we clear ballast off the track between Poles 39-46ish. The goal is 700 ties on the mainline this year which we will begin to distribute next weekend. Slow orders and O.O.S. bulletins ARE posted and will stay in place until repaired. We called it a day with dinner at Joe's and wrapped up a lot of loose ends. Frank will be out tomorrow and next weekend we'll begin loading flat cars with ties for distribution and probably working on repairs as well as continued inspection. Come out and join the fun! ***If you're interested in helping out give me a shout at lzeje657@msn.com or find any one of us on most weekend and we'll get you hooked up! Adam Robillard IRM Roadmaster lzeje657@msn.com |
Blog AdministrationFind us on FacebookCategory TreeCalendarQuicksearchArchivesSyndicate This Blog |
Powered by s9y.
Comments
Sun, 05-19-2013 22:13
Hello again. I had an idea that was (somewhat rudely, mid-sentence) dismissed in talking to a museum volunteer a few years back, but here it goes [...]
Thu, 05-16-2013 21:52
Looking good Bob! I hope to come out soon once I'm done with school.
Wed, 05-15-2013 21:28
I was not around at the time. General discussion suggests that it was "pretty marginal" in a number of areas. Nigel
Mon, 05-13-2013 11:08
"THUMBS UP!"
Fri, 05-10-2013 02:15
No, it will not be necessary to hold any of the work waiting for the plow to be turned, end for end. Weather will be the major factor, but there will [...]
Thu, 05-09-2013 19:54
The CGW X-38 plow is really coming to life. Bob Kutella and Vic and crew need to be very proud of your collective efforts. I am very appreciative of [...]
Thu, 05-09-2013 15:20
The snowplow looks great! Are you going to apply the door and upper windows befor it is turned to continue work?
Thu, 05-09-2013 09:09
Max, Is there any progress to report yet, in regards to the installation of the poles and overhead wires? Have a good day, sir.
Wed, 05-08-2013 18:40
Thanks for the update! I still don't understand why Commonwealth #5 was removed from service. Do you know why?
Tue, 05-07-2013 09:28
Mr. Kolanowski.....I was just wondering if the Spaulding webcam will be up and running soon for us stay-at-homes. Thanks!2FP
Mon, 05-06-2013 23:04
Max, Has work begun yet on the construction phase of erecting the poles and putting up the wire? Wish I could be there to watch it happen.
Mon, 05-06-2013 23:02
Keep up the good work, Bob. Wish I could be there to help!!!!!!!