Another good day in the shop although I think most people were moving a bit slower due to the 90 degree temperatures.
Work on 1630 continued as planned:
· Despite the heat, Dennis put in many hours in the firebox and has now built up the inside face of the mud ring.
Now Mike has a lot of work to carefully drill the rivet holes thru the new weld, at which point the mud ring will be ready to receive the patch. This will be a slow and tricky job requiring the accurate drilling of small pilot holes that must be steadily enlarged as creating an accurate hole thru the weld is never easy;
· Work continued with Bob on the form 4. We now have a detail plot of all the measurement points and a few new ones marked up for the next UT testing session (hopefully 6/2);
· Several of us worked on completing the diagrams that Bob will need in support of the form 4 showing the location of each thickness measurement point on the particular boiler sheet. Boring work but at least it is good to see the book that will support the form 4 starting to come together;
· Part of Phil's extensive sand blasting effort was the dome cover as noted last week. Now we have the "after" view ready for inspection and testing
· We located a length of tube suitable for safe ending the super heater flues so now we can progress with this when resources are available;
· One unfortunate set back was that the piston rod of the McCabe flanger broke during test bending of steel for the patch. Several of us spent quite a bit of time checking the storage for a spare but this proves to be one of the parts for which we do not have a spare. The broken rod has been stripped out and sent for analysis. Once we have this a similar steel rod will be acquired and machined.
Phil did a solid day of sand blasting and, aside from the dome cover for 1630, also did all four of the axle boxes for 428 and the bolster for the Shay. This was quite an effort given the heat. Unfortunately one photograph I missed was Phil after working most of a hot day in a cloud of black dust. The trouble was that, like most of his sympathetic colleagues, I was too busy laughing and joking about his appearance to hold the camera!!. Sorry Phil.
The results of his efforts can be clearly seen on the bolster for the Shay. This now looks very different and, aside from the improved appearance, appears free of any cracks after detail inspection.
In other areas:
· Ed and Rick worked on setting up the rivet furnace to cast the new brickwork.
· Stu and Cameron continued work on the planer.
· Bob operated the water supply to provide treated water ready for Leviathan.
I will not be providing an update next week as I will be out of circulation for a hopefully minor operation.
Nigel
Comments
Mon, 06-17-2013 09:50
Wish I could be there to help.
Fri, 06-14-2013 16:50
Matthew, Any special event is the decision of the museum Board. My personal opinion is that it is likely that there would be a special event to [...]
Thu, 06-13-2013 18:33
Hi, I have a question, if or when she is restored and back up and running this or next year. Will their be a special event set up for the return of [...]
Tue, 06-11-2013 22:36
The whistle 1630 wore for a while that you're thinking of was a Frisco 6 chime donated by a former member of the steam shop. It was on it a few times [...]
Tue, 06-11-2013 18:03
You are talking here about something well before my time !. I have not seen her with anything other than the whistle she now carries. If she [...]
Mon, 06-10-2013 16:17
i'm curious here. Will 1630 ever wear the ATSF 6 chime she had on for a while? Better defines her, I love the deep whistle she has now but the higher [...]
Sat, 06-08-2013 15:15
Many many many many many thanks for getting the Spaulding webcam working!!!!!
Fri, 06-07-2013 16:55
The donation was to the museum as a whole. How it is used and whether any comes to steam department projects will be the decision of the museum [...]
Fri, 06-07-2013 16:53
Basically the plan is "ONLY" reassembly. As far as we know she is is reasonable mechanical shape. The big mechanical problem that stopped her (slack [...]
Fri, 06-07-2013 16:28
Nigel I read you guys got a one million dollar check donation!!! Will this be used to finish 1630 ,428, 5 and get started on the others next in line?
Fri, 06-07-2013 16:16
So does 1630 basically only need reassembly? With the boiler in particular. Does her tender or running gear need any work before she's ready for the [...]
Fri, 06-07-2013 12:00
Hello.. The voltage we are using and presumed the RR also used is 120 vac. The system is a little unique because the lite bulbs are each 60 volts. [...]