We were all happy to see Al Reinschmidt visit the shop. Al is a long time member, volunteer, supporter, booster, and worker in many of our missions. Circumstances have curtailed his participation but he managed a visit yesterday to the delight of many, and got updated on many of the projects.
Simon Harrison resumed work on our Cleveland Transit System 4223 PCC car. Here is one of the salvaged ceiling panels made of hardboard composition material. The goal is to preserve and use as many of these as possible. In the near corner you may see the first work in trying to sand off the many old layers of cracked and failing paint.
By the end of the day Simon has completed about 1/4 of the paint removal, and doing a very fine job. This is a new task so many techniques and tools were needed to see what was most effective. The panels are of a size that merely replacing them is not an option.
Henry Vincent and Pete Galayda have just succeeded in removing the arbor nuts and old saw blades on this double arbor table saw. One task at a time, Henry is doing well along the path to restoring this to operations and providing another tool in the restoration wood shop arsenal.
Now, on to the 'making sawdust' tasks, where I spent most of my time. All the following is for work on our Chicago Great Western X 38 snowplow.
John Faulhaber and Dave Rogan are slicing new 3/8 inch hardwood quarter round from stock on our table saw. We have to make this ourselves, it cannot be purchased from any of our suppliers. The process involves a sort of production line, setting up the router table to make a roundover profile, and then taking that stock to the saw to cut the piece free.
John Faulhaber, Jim Leonard, and Dave Rogan all were involved. Here they show off almost eighty lineal feet of completed moldings. That should be enough for the eight new cupola windows on the plow.
The next steps involve cutting tenons on the two rails for each window. Dave Rogan and Jim Leonard draw an audience - everybody is fascinated by work. There are about five distinct steps for producing the tenon, each requiring a different set up on the tools. And each pair of these new windows is a different size or shape. Tenons are now done on four sets of the parts.
As fast as the rails could be tenoned, John Faulhaber started the custom fitting of the parts for each one window. Haunch the tenon, trim to length and thickness, clean out and adjust the mortise, miter the beading. Times FOUR for each frame.
All of this does not happen by magic. Each window must be designed, drafted, and drawings created for the sawdust guys to make the cuts. Rich Witt is very reliable in this task and spent much of the day on the drawings. Sometimes we were pushing him hard to complete a set for one design, and the tools were put to use at once.
Comments
Sun, 05-19-2013 22:13
Hello again. I had an idea that was (somewhat rudely, mid-sentence) dismissed in talking to a museum volunteer a few years back, but here it goes [...]
Thu, 05-16-2013 21:52
Looking good Bob! I hope to come out soon once I'm done with school.
Wed, 05-15-2013 21:28
I was not around at the time. General discussion suggests that it was "pretty marginal" in a number of areas. Nigel
Mon, 05-13-2013 11:08
"THUMBS UP!"
Fri, 05-10-2013 02:15
No, it will not be necessary to hold any of the work waiting for the plow to be turned, end for end. Weather will be the major factor, but there will [...]
Thu, 05-09-2013 19:54
The CGW X-38 plow is really coming to life. Bob Kutella and Vic and crew need to be very proud of your collective efforts. I am very appreciative of [...]
Thu, 05-09-2013 15:20
The snowplow looks great! Are you going to apply the door and upper windows befor it is turned to continue work?
Thu, 05-09-2013 09:09
Max, Is there any progress to report yet, in regards to the installation of the poles and overhead wires? Have a good day, sir.
Wed, 05-08-2013 18:40
Thanks for the update! I still don't understand why Commonwealth #5 was removed from service. Do you know why?
Tue, 05-07-2013 09:28
Mr. Kolanowski.....I was just wondering if the Spaulding webcam will be up and running soon for us stay-at-homes. Thanks!2FP
Mon, 05-06-2013 23:04
Max, Has work begun yet on the construction phase of erecting the poles and putting up the wire? Wish I could be there to watch it happen.
Mon, 05-06-2013 23:02
Keep up the good work, Bob. Wish I could be there to help!!!!!!!