There was continuing progress this weekend although we did encounter some issues that made progress a good deal slower than we would have hoped.
On 1630:
· The central focus was on rolling tubes. A further 17 tubes were successfully rolled at the firebox end. However this was far less than we had hoped as a result of an occasional problem which causes the ferrule to move along the tube as the tube expands into the sheet. When this happens, the tube and the ferrule must be removed and replaced. This is very time consuming and cannot be allowed to happen often as we have only a limited number of spare tubes.
· After a good deal of testing and investigation of possible causes we will acquire a new tube roller during the week and are hopeful that this will cure the problem. Once we can overcome this issue progress should be a good deal faster. We probably rolled the 17 tubes in less than an hour and the remaining six hours were spent in removing and replacing the damaged tubes a s well as trying to resolve the issue.
· Ed continued fitting the replacement pipe work along the boiler and has now completed the most difficult runs.
· The patch is now bolted into place and we are waiting on Dennis's availability to finally heat shape it into alignment with the existing inner firebox sheets ready for welding.
· Work continued on cleaning out the cab for refitting. The canvas curtains are now off and will be measured for production of the replacements. Canvas has a finite life after which it falls apart very easily. I think we can safely say that the finite life of these curtains has been reached!!.
In other areas:
· Stu and Bob made good progress on the planer. Most of the major assemblies have now been cleaned and prepared. The bed is ready for them to be refitted and the new electrical control system is being assembled. The various connecting pipes were measured to order replacements. Let's just hope the guys have a good plan of what connects to what !;
· The area around the new compressor was cleared ready for final positioning. Once we have it positioned we can install the vibration isolating mounts and prepare to wire it up.
· Work also started on preparing the Shay truck for re-assembly. The bolster must be drilled as the central hole, thru which runs the mounting pin, had developed an interesting oval shape. Purists believe that a round pin is best located in a round hole so this has been built up with weld and will now be drilled to produce a hole of the correct diameter.
So reasonable progress on a number of fronts. Hopefully next week we can get tube rolling to progress more reliably and move on with that.
Nigel
Comments
Sun, 05-19-2013 22:13
Hello again. I had an idea that was (somewhat rudely, mid-sentence) dismissed in talking to a museum volunteer a few years back, but here it goes [...]
Thu, 05-16-2013 21:52
Looking good Bob! I hope to come out soon once I'm done with school.
Wed, 05-15-2013 21:28
I was not around at the time. General discussion suggests that it was "pretty marginal" in a number of areas. Nigel
Mon, 05-13-2013 11:08
"THUMBS UP!"
Fri, 05-10-2013 02:15
No, it will not be necessary to hold any of the work waiting for the plow to be turned, end for end. Weather will be the major factor, but there will [...]
Thu, 05-09-2013 19:54
The CGW X-38 plow is really coming to life. Bob Kutella and Vic and crew need to be very proud of your collective efforts. I am very appreciative of [...]
Thu, 05-09-2013 15:20
The snowplow looks great! Are you going to apply the door and upper windows befor it is turned to continue work?
Thu, 05-09-2013 09:09
Max, Is there any progress to report yet, in regards to the installation of the poles and overhead wires? Have a good day, sir.
Wed, 05-08-2013 18:40
Thanks for the update! I still don't understand why Commonwealth #5 was removed from service. Do you know why?
Tue, 05-07-2013 09:28
Mr. Kolanowski.....I was just wondering if the Spaulding webcam will be up and running soon for us stay-at-homes. Thanks!2FP
Mon, 05-06-2013 23:04
Max, Has work begun yet on the construction phase of erecting the poles and putting up the wire? Wish I could be there to watch it happen.
Mon, 05-06-2013 23:02
Keep up the good work, Bob. Wish I could be there to help!!!!!!!