Here is another report, heavy on photos, aided and abetted by images taken by Jon Fenciki, and just a whole lot of activity by the volunteers.
This a a very good example of how projects should work in the shop. Four days ago Jon Fenlaciki brought in a window that needed repair, from Indiana Railroad 65. We noted what we thought should be done and supplied info to Jon on purchasing new wood. Jon did exactly that and delivered some new mahogany Saturday morning. Before you knew it the stock had been roughed out and planed, and here - Bob Kutella, Rich Witt, and John Faulhaber are setting a jig for cutting the stop cuts for new tenons. Jon was on the spot, making decisions as needed and helping with the work. A real team effort.
The tenons are being nibbled away by Rich Witt and John Faulhaber on the table saw.
Rich has the new bottom rail complete, ready for final fitting, while Jon displays the original piece, the reason for the work.
It is always good to throw in a quiz question to see if the class is paying attention. What is it? Maybe some peanut butter and a glob of creme filling? See next photo for the surprise answer.
The new bottom rail has been fitted and the window reassembled. Rich Witt is using an epoxy product that is both an effective adhesive and also serves as a wood repair filler. The window is clamped up and will be ready for sanding and refinishing the next visit to the shop by Jon. Our new motto - "One day and done!"
Victor Humphreys is making some final fit checks and careful readying three end fittings for welding to the curved caboose grab iron. A lot of metal grinding and filing, foreign to a sawdust maker like me. It is looking good.
Victor Humphreys and William Peterson are busy completing the gray primer on all eight new windows for Chicago Great Western X 38.. Bill is a relatively new volunteer in the shop and seems intent on completing his 'apprenticeship' and joining the old hands club. Thanks Bill
We finished up a lot of 'small' projects early in the day before quitting time, so went on to the next steps for the two new doors for CGW X 38. That means setting up the mortising machine to plunge many slots in the door stiles and rails. William Peterson is making and installing new wood blocks for the 'hold down' clamps on the mortiser. Basically, almost every job is a different size and set up, and it takes some small time to get it ready. Set up complete, we made two mortises and hung an OUT TO LUNCH sign on the machine.
Now to continue the story of Chicago Rapid Transit 1024, from last weeks report. Tim modified (sacrificed) a carbide router bit and ground it for the custom profile needed for the "UPPER" tack molding on the 1024. That is the piece that finishes the edge of the large flat roof, while a similar but different piece is needed alongside the hip roof areas, that called the "LOWER" tack molding. The best product is very long pieces of stock to minimize joints in this rail. It takes many hands to to this work carefully, here done by John Faulhaber, Fred Zimmerman, and Tim Peters.
Fred then hand sanded many pieces of this, and finished the effort with prime painting all of them.
It can be difficult to visualize how a project's parts need to be made and to go together. Here is a mock up of a key element needed for the next two windows for Boston & Maine 1094. The small heel or haunch on the side stiles will support and anchor the rounded top rail. We used a variety of steps, jigs and tooling to make this part shown by Rich Witt.
Buzz Morisette is slicing thin strips of oak on a bevel cut. These will be replacements for damaged ceiling moldings in the private car ELY.
Dave Fullarton, Greg Kapka, and Richard Schauer were in the Barn 4 pit working on the group switch underneath rapid transit car CTA 2154.
As usual a lot of other work going on in the shop and around the property. I did not catch a pic of this, but we finished running six windows for heavyweight passenger car Illinois Central 3996, working with Roger Kramer, and also completed and surfaced the first of the door panels for the new CGW X 38 doors.
Comments
Sun, 05-19-2013 22:13
Hello again. I had an idea that was (somewhat rudely, mid-sentence) dismissed in talking to a museum volunteer a few years back, but here it goes [...]
Thu, 05-16-2013 21:52
Looking good Bob! I hope to come out soon once I'm done with school.
Wed, 05-15-2013 21:28
I was not around at the time. General discussion suggests that it was "pretty marginal" in a number of areas. Nigel
Mon, 05-13-2013 11:08
"THUMBS UP!"
Fri, 05-10-2013 02:15
No, it will not be necessary to hold any of the work waiting for the plow to be turned, end for end. Weather will be the major factor, but there will [...]
Thu, 05-09-2013 19:54
The CGW X-38 plow is really coming to life. Bob Kutella and Vic and crew need to be very proud of your collective efforts. I am very appreciative of [...]
Thu, 05-09-2013 15:20
The snowplow looks great! Are you going to apply the door and upper windows befor it is turned to continue work?
Thu, 05-09-2013 09:09
Max, Is there any progress to report yet, in regards to the installation of the poles and overhead wires? Have a good day, sir.
Wed, 05-08-2013 18:40
Thanks for the update! I still don't understand why Commonwealth #5 was removed from service. Do you know why?
Tue, 05-07-2013 09:28
Mr. Kolanowski.....I was just wondering if the Spaulding webcam will be up and running soon for us stay-at-homes. Thanks!2FP
Mon, 05-06-2013 23:04
Max, Has work begun yet on the construction phase of erecting the poles and putting up the wire? Wish I could be there to watch it happen.
Mon, 05-06-2013 23:02
Keep up the good work, Bob. Wish I could be there to help!!!!!!!