![]() |
![]() |
Saturday, December 24. 2016
Merry Christmas from the Coach Dept Posted by Roger Kramer
in Passenger Car Department at
15:59
Comment (1) Merry Christmas from the Coach Dept
I just wanted to wish everyone a Happy Holiday from the Passenger Coach Dept! We are all very optimistic about the 2017 season. Many ideas and events are changing the museum for the better. Some surprises might be also on the horizon, we will see how they all play out in the next year. In the mean time remember the museum equipment in your year end donations!
Pictured left to right are; Austin Harvey, Jeff Button, Roger Kramer[ blog author ],
Bob Albertson, Bob Olsen and Sandi
Harreld. We were all working this last Wednesday on painting more parts for the RI 2524! Ho Ho Ho Roger
Friday, December 16. 2016Coach Dept Team Work
For those of you new to this site the coach department has begun restoring our last Rock Island coach,2524. Our goal is to have it in service for next years [2017] Thomas event. The 2017 Day Out with Thomas has been moved to the first two weekends in July. You will here more of this event starting in next years advertising schedule. This is our last coach and we hope to get it ready by devoting many of our department volunteer hours into this project. Its so cold that we are now working in the nice heated area in the barn four annex. It sure is comfortable and productive working in the warmth. Last week we made ourselves a temporary paint both in barn 4. These pictures all refer to this work project. This last Wednesday we had six workers focusing on this single job of painting seat parts. BTW we have estimated we have about 300 parts to paint just for the seat frames for this coach.
Jeff and Bob are scraping paint off of the ceiling light fixtures. Yes, we also have 26 light fixtures to prime and paint. Friday, December 9. 2016Steam Department - December 2016
It has been an awfully long time!.
The Summer is always a bad time for blogging about the steam shop. Operating is very time consuming, leaving relatively little time for other work and after that, things rather got away from me.
So what is happening now in the steam shop?.
Everything is winterized and positioned in the shop for the off-season work program. However, the layout in the shop is unusual and this hopefully indicates a big change. #428 remains at the South end but next to her is #1630 with Shay #5 at the North end. In part this is because the (limited) planned work on #1630 this Winter is best done over the small area of deeper crawl space but mainly because it is hoped that #5 will be the first locomotive into steam in 2017!.
So, what is the status of the locomotives and plans for this Winter.
#1630
The decapod had a very successful running season after the incident in June with the broken truck Spring. Thereafter all planned running days were achieved with only very minor incidents. The most significant was probably the breakage of a lubricator line to the crosshead guide. Some rapid brazing by Brian meant that we only missed a couple of trips that day.
The valve and running gear work over the last couple of years seems to have much improved the locomotive. She is now probably stronger than at any time since she arrived from Eagle Pitcher. With other aspects of the running gear now better adjusted, the most obvious unwanted noise was from the rods on the fireman’s side. So the non-routine work for this Winter is primarily the replacement of the rod bearings of the drive axle on this side. The rods were removed promptly once she was in the shop and the bearings are now in the machine shop. Measurement has demonstrated that they are indeed worn beyond acceptable railroad standards. So replacements will be machined and fitted.
Aside from this the annual inspection is in progress. All the normal “fun” tasks are being progressed.
· gauges and safety valves are off for testing and setting;
· drawbars have been removed thoroughly cleaned, inspected for any cracks and will shortly go offsite for annealing;
· the locomotive has been resounding to the tapping and banging as we crawl all over the inside and outside of the firebox, clearing the telltale holes in the stays and then checking that they are clear to the required depth. Good progress. The outside is done and the inside is well advanced;
· cleaning and inspection of the smokebox and front tube-sheet is well advanced.
It is also planned to do some “improvement” work on a couple of the drive box wedges. One has had a distinctly questionable adjusting bolt for many years that makes adjustment awkward and another is believed to be just about at the limit of its adjustment. So the plan is to correct this over Winter.
Shay #5
Work on Shay #5 has progressed steadily and is now hopefully approaching the point where an intensive spell can be scheduled to get her to operating condition.
Major activity has included:
· Dennis welding the new smokebox bottom into place. Recently he was relaxing in his purpose-built hammock structure! to complete the grinding of the joint on the engineer’s side;
· Jerry has substantially completed the lagging and installation of the cladding is well under way;
· Substantial progress has been made on the next big step, which is installation of the blast pipe into the smokebox. On a Shay, that has had a rebuild of this scale, this is a 3 dimensional jigsaw started knowing that some of the pieces are missing!.
Obviously, as with any steam engine, the blast orifice must center below the petticoat of the chimney to ensure the most effective drafting. Also, it must bolt thru the floor of the smokebox and into the exhaust casting. However, unlike a rod driven loco, the exhaust casting of the Shay is not the top of the cylinder casting, firmly fixed into place, but a heavy casting that joins with some flexibility to the exhaust pipe and is bolted at several points to the smokebox. The game is that, once all the attachments are made, there is just about zero flexibility in how the exhaust casting must sit and attach to the exhaust pipe and blast pipe and, to ensure the smokebox is sealed as well as possible, all the mounting holes need to be a good fit. Since the smokebox bottom is entirely new (and the original was so rusted as to be useless as a template) the game is to juggle and test fit these heavy and awkward parts accurately into position so that the mounting hole scan be marked for drilling and cutting with a fair degree of accuracy. The acid test will come in a couple of weeks when we offer it up again and try to bolt everything into place!.
· The air pump was finally reassembled as well. Mike has thoroughly stripped and reconditioned this unit, so this should now be pretty much ready to go.
· A big exercise completed over recent weeks, by Dennis, is the fire-grates. This was not a planned exercise. #5 was an oil burner that was converted to coal on arrival at IRM. The original conversion, in the 1970’s, was less than satisfactory and part of the rebuild planned when she came out of service in 1998 was to fit a new and robust grate system. This was designed in advance and parts were obtained ready to fit, including the cast grates complete with rocking levers, that were produced by a supportive (and now defunct) local foundry. The finding that the tube-sheet required repair turned the overhaul from a 2-3 year job to nearly 20 years. The grate castings sat unused for more than 10 years and it was only when they were pulled out of storage, to build the new grate mechanism, that it was discovered the foundry had misread the drawings and cast the rocking levers facing the wrong way!!. Since they are cast iron, you cannot simply cut the levers of and weld the back facing the other way!. The solution for now has been to fabricate steel sections that can fit thru the grates and allow the levers to be attached in the correct configuration. Time will tell how well this will stand up to operation. It is hoped that it will allow at least a couple of years of service but there is no doubt that we will need to gather the money (estimate about $6,000) to have new grates cast correctly to the drawings. The good thing is that the grates that Dennis has modified are now exactly the shape that the design specified so, once we can get grates correctly cast to the pattern, it should be a routine maintenance activity to substitute them.
· There is still much to do, including:
o Rebuilding the front beam once the exhaust assembly is finally installed;
o Fitting the grate rocker assembly;
o Sealing /lining the inside of the water tank;
o Plus the myriad of once smaller tasks that are always involved in bringing a locomotive back into operation.
However, the expectation is that she will be ready to test in the Spring.
#428
Various work has continued on #428. The biggest has been work on the valves. It was decided to progress the valves while the experience of the work on #1630 was fresh in the mind. While the detail of these valves is earlier than #1630 and differs in some ways the basic structure is the same. Extensive measurement has been done to identify where it is necessary to build up the spiders and ends to allow them to be machined to critical dimensions. Based upon this, the plan is to repair and machine to specification and then get the valves reassembled.
#938
During the Summer, Phil and others continued the laborious task of removing rust and repainting. She now looks better than she has in many years and is now back into barn #9 following completion of repair work on the barn walls.
#2903
The commissioning of the renovated Santa Fe sign provided an unusual opportunity to see one of our large locomotives in the open. She was posed behind the sign along with the Warbonnet #92 for the dedication ceremony. Sadly, she aroused less than happy memories for one of our honored guests, a retired senior Santa Fe executive. As a young man, she was memorable for having barfed a large quantity of black gunk all over his good suit during a re-railing operation!. Oh well.
So we reach the end of another year. I am away to the UK for a couple of weeks. It will be a busy Winter but it promises to be an interesting New Year with the prospect of two running locomotives. Please consider supporting the Steam Department projects this year end. Money is always a limiting factor in all of our projects and will be critical in ensuring that the Shay does run as planned as well as ensuring that we can continue the improvement work on #1630.
Happy Christmas
Nigel
Monday, December 5. 2016More Happy Holiday Scenes
Here are more holiday museum scenes taken this last Saturday before the 6 inch snow fall.
Hope you enjoy the views of our Holiday Train and the crews that make it happen. Roger
Sunday, December 4. 2016Steam newsHere is some of the latest news from our steam shop. I thought I would pass these developments to you since the flow of news has been spotty, recently. This fall emphasis have been concentrated on the shay, 1630, wheel lathe, the 428 mechanicals, and RI 938. Part of the reason the shay has taken so long to complete has been the complete rebuilding of many old failing parts. Newly manufactured grates poured at a foundry a few years ago had to be custom fitted and tabs for the grate shaker welded by our volunteer welder. In this first picture is the new connection in the smoke box of the dry pipe flange. Again all made by our volunteers. The bottom of the smoke box was so badly deteriorated and rusted from years of coal dust and ciders that a new bottom section was needed. The old rusty steel section was removed. An outside steel company then rolled two new pieces to the specs Tom Schneider had prepared. It was then riveted back into place. O yes, I almost forgot all tubes were cut out and replace with new. This was done about three years ago. Rebuilt and tested super heater tubes were also installed at that time. This last summer the boiler pasted it federal hydro test! All this takes a lot MONEY, time and volunteer hours. While this project was slowly being worked these last many years, the 1630 received the majority of the attention of our volunteers Now the work has begun again on the Shay and, hopefully, it will be operational in 2017Here is the recently installed and rebuilt cross compound air pump used to make high pressure air for the operation of the air brakes. Mike has has working on this project for about six months. This is a good definition of on the job training. Nice job Mike. To add to the holiday magic this time of year, Santa this time has decoriated the 428 with festive lights. Thanks Santa. Not to be outdone the UP 428 is receiving much needed attention. Here are the driving boxes that the wheels roll on. It has been a very lengthy process getting them to this juncture. Much machining and welding has taken place on each one of them. |
Blog AdministrationCategory TreeCalendarQuicksearchSyndicate This Blog |
Powered by s9y.
Comments
Tue, 01-19-2021 20:11
Dear, IRM The N and W 611 is coming to the IRM 2021 NHS. OK IRM.
Fri, 01-15-2021 10:20
Hello Jason. Your comments are very much appreciated. Yes, there is much hard work that goes into all our restorations and maintenance here at the [...]
Fri, 01-15-2021 10:13
Hello Jack Yes, It will be one of our most impressive cars that we have at IRM when its completed. Thanks for the pat on the back! Roger.
Thu, 01-14-2021 21:05
Those cars look great so far guys! Man I wish I had the time to volunteer and become a member at IRM that looks like so much fun especially with how [...]
Tue, 01-12-2021 16:30
the pawnee is looking great a pat on the back to all involved
Wed, 01-06-2021 10:14
Good job on coach updates January 5, 2021. Sincerely, Ethan A.
Mon, 01-04-2021 12:31
Hello Jack Happy New Year from IRM. To my knowledge there was no damage from the minor ice storm that we had in late December, 2020. Some [...]
Sun, 01-03-2021 20:12
the museum area had lots of ice storms in area did the museum get a lot of damage
Thu, 12-24-2020 13:27
roger, Thank you to all of the Passenger car department volunteers. The #109 is going to be a great car when all done! Ted miles, [...]
Sun, 12-06-2020 08:46
Hello Ted We havenot finished lettering the 975 but we are well on the way. Look for a few blogs from me now that the wearther is colder and the [...]
Sat, 12-05-2020 18:36
i watched crew replace switch by diesel shop on dec 5. its good to see museum have equipment to do job and save money
Fri, 12-04-2020 14:56
It has been a long time with no news; have you finished lettering the Southern Pacific locomotive? Please post a picture. Ted Miles, IRM Member