| BLOG | DIRECTIONS | SCHEDULE | STORE | |
Thursday, October 11. 2012
Michigan Electric 28 Update - ... Posted by Ray Schmid
in Michigan Electric 28 at
13:15
Comments (3) Michigan Electric 28 Update - October 7, 2012Rear Roof Slat Installation Completed With the cooler Autumn temperatures comes greater progress in the carbarn. On Sunday, Jeff Brady fired up the roof slat steamer for bending and installing the final slats on the rear of the car. I took a few pictures of Jeff while he was completing this important milestone. The first picture shows Jeff on the rear scaffold holding the cap to the slat steamer pipe. Can you see the slat inside the pipe waiting to be heated by steam? When Jeff thinks the slat has “cooked” enough he quickly removes it and bends it to the correct curvature while nailing it in place. While bending the slat, Jeff hand tapers the bottom end before nailing it to the tack molding. At last the final slat was installed! Can you see Jeff’s finger pointing to the small wedge shaped slat that finished the job? Well done Jeff, the St. Louis Car Company would be proud! After a final sanding of the top layer of slats, Jeff will move on to tackle the front of the car next. I see a lot more slat bending and steaming in Jeff’s future. While Jeff was working on the roof of the car, I was fabricating the first of five window guards for installation in the rear vestibule. We do not have the original window guards as they were probably removed when the car was used as a cottage prior to 1971. We did obtain the correct match for what was there, except the tube lengths are wrong. Therefore, I have disassembled them and am now cutting new tubing to the correct length for reinstallation. The picture below shows the first window guard temporarily installed to check the size and look. I still need to install cold rivets to hold each of the four tubes in place. The window guard will be primed, and painted a finish coat of orange before installation. Interested in the 28 with time on your hands? We are always looking for volunteers to help us finish the car to it's former glory. To join the restoration team, please see us at work on Tuesdays and Sundays in Barn 4/Electric Car Shop. Monetary donations are always welcome. Donations buy the materials, we supply the labor. Mail funds to IRM designating the ME28 restricted fund. Thanks! All pictures taken by Ray Schmid. Additional ME28 pictures can be seen in the IRM Member Photo Gallery @ IRM.org. Tuesday, August 7. 2012
Michigan Electric 28 Update - August ... Posted by Ray Schmid
in Michigan Electric 28 at
08:54
Comments (0) Michigan Electric 28 Update - August 5, 2012More Side Window Replacement and Roof Slat Installation On Sunday, Norm Krentel and Ray Schmid were successful in installing five restored windows into the right rear window openings. Two storm window sashes and two lower sashes were installed along with one interior upper sash. All the wood stops and trim pieces were also screwed in place to hold the windows. The pictures below show the finished upper sash. Side note: Only the interior upper sash contains pressed prism glass that is frosted. The exterior pressed prism glass is clear. The pattern on both windows is identical. The light coming through the newly cleaned prism glass is making these windows appear much more attractive now that the raised arch pattern can be seen. Jeff Brady is shown below nailing the second and final layer of slats over the first. Each basswood slat needs to be hand tapered and fitted so that it will lay flat on the rear curved roof. He is finished with the second layer where the slats will bend without breaking. The side slats on the left and right have such a severe bend that they will break in two or split if they are bent dry. These will require Jeff to treat them with steam until they become more pliable. Once bent and nailed, the steam treated slats will retain their shape after drying. With the 90 to 100 degree weather we are having this summer Jeff is waiting for the weather to cool before using steam in the car barn. I think this is a wise decision! Thursday, August 2. 2012
Michigan Electric 28 Update - August ... Posted by Ray Schmid
in Michigan Electric 28 at
12:30
Comments (2) Michigan Electric 28 Update - August 2, 2012Roof Slat Installation and Side Window Replacement Continues! Jeff Brady is shown below belt sanding the first layer of rear roof mounted wood slats. In the blazing heat this summer, he is nailing the second and final layer over the first. The front and rear will both have two layers of slats that create the contour of the roof. The center carlines of the roof were covered with formed Masonite hard board that has now been painted with a flat black primer. Holes were recently cut by Walt Staffa (not pictured) for the roof vents that will be added following the installation of the canvas roof covering. Shown below is Doug Johnson removing the vent louvers inside the car before Walt cut the holes in the Masonite roof. Norm Krentel continues to disassemble the window sash openings to repair or replace the numerous pieces of wood stops or guides, and metal post caps while the sashes are out for restoration. Upon their return, the sashes are fitted with latches or lifts that will allow the passengers to operate the windows. Several window openings have been completed with the restored windows.
Ray Schmid is shown below installing the latches and lifts to the restored lower sashes. Also shown is Ray’s process for cleaning each pane of ornate upper sash glass before he sets them into the restored frames. There are interior and exterior upper sashes that span a set of two lower sashes. Ray has installed several cleaned panes into the waiting frames. Several of the pressed glass upper sashes have been installed on the car this summer. The press glass exterior upper sashes were painted white while the car was used as a cabin in Michigan and did not allow light to pass into the interior of the car. After paint removal and cleaning, the newly installed sashes make a huge difference in the appearance of the car. The before and after result is amazing! See for yourself in the above pictures in front of Norm.
Tuesday, November 15. 2011Michigan Electric 28 Update - November 13, 2011Roof Slat Work Continues While Side Window Replacement Begins Jeff Brady has reached the most difficult portion of the roof slat installation, the corners. At the corners there is little space remaining to bend and nail the last few slats. Therefore, most car builders utilized a wooden corner block to fill and retain the proper curvature of the roof lines. In the left picture below, Jeff is using the band saw to cut a large triangular block of wood before beginning the process of shaping the precise corner contour. The picture on the right, shows a previously cut sample block placed in the opposite corner to demonstrate placement.
Norm Krentel has begun the process of dismantling the side window tracks. He has already removed the sashes and is shown below examining what needs to be replaced and what can be reused. Soon the newly rebuilt windows will be installed. More on this exciting process in a future report.
Ray Schmid is shown below applying a gloss finish to the upper sash window frames. In future weeks the pressed glass will be installed and the completed sashes inserted into the window openings. The exterior pressed glass upper sashes were painted white while the car was used as a cabin in Michigan prior to arriving at IRM in the 1970s. The tedious method to remove all the old dried paint, from the numerous tiny crevices in the ornate glass pattern, will begin next week.
Tuesday, September 6. 2011
Michigan Electric 28 Update - ... Posted by Ray Schmid
in Michigan Electric 28 at
08:34
Comments (2) Michigan Electric 28 Update - September 3, 2011An Historic Moment! First Roof Slats Installed After cutting 300+ roof slats during the previous weekends, the time had come to begin the installation of the roof slats onto the roof ends of the car. The rear of the car was chosen because of good lighting and the lack any special cutting unlike the front which has the roof mounted headlight. Jeff Brady and Ray Schmid worked in the morning to prepare the carlines for the installation. Fans used in the morning to move the hot, humid Car Barn air were not needed later in the day as rainy weather arrived in the early afternoon and brought cooler temperatures that made the working conditions better. Work will continue during September to complete the ends with two layers of roof slats. Pictured below: Ray Schmid and Jeff Brady, nailing the first slat.
Pictured below: Ray finishes the day by nailing the 10th roof slat.
Tuesday, August 16. 2011
Michigan Electric 28 Update - August ... Posted by Ray Schmid
in Michigan Electric 28 at
13:10
Comments (2) Michigan Electric 28 Update - August 14, 2011Final Roof Panel Installed and All Roof Slats Cut!!! A major roof milestone has been achieved this week. The final roof panel was installed by Ray Schmid. A mini-celebration was held on the ME 28’s roof last Sunday afternoon to commemorate the installation of the final roof panel. Pictured below: Ray Schmid and Nancy Ring celebrate the driving of the last roof panel screw. (A Jeff Brady picture.)
Nancy Ring travelled from Milwaukee and assisted Jeff Brady with cutting the remainder of the roof slats in the woodshop. Now work can begin on the roof ends where the basswood slats will be bent and nailed over the carlines. Pictured below: Ray Schmid holds the first roof slat showing it’s size. Two layers will be bent and nailed down to cover the car ends. Nancy Ring is also pictured. (Again, Jeff Brady is our cameraman.)
Monday, August 8. 2011
Michigan Electric 28 Update - August ... Posted by Ray Schmid
in Michigan Electric 28 at
10:06
Comments (0) Michigan Electric 28 Update - August 6, 2011Roof slats, roof slats, and more roof slats…. Since the Northern Illinois mosquito population decided to hold a meeting in Barn 4 last Saturday, Jeff Brady and Ray Schmid thought it would be better to avoid them by working on cutting the ME 28 roof slats in the woodshop. Between the high humidity, heat, and the numerous mosquitoes, it was a good decision. Jeff planned ahead and brought out enough five foot basswood planks to create all the thin roof slats required to cover the car ends with two layers. We needed to produce over 300 slats. This was a slow process to begin since you do not want to rush the table saw setup or you will have 300 unusable slats with the wrong dimensions. But, once the setup was verified, Jeff and Ray stayed at it all day making the saw dust fly. Pictured below: Jeff setting up the table saw. Ray and Jeff making the first cuts.
Pictured below: Jeff measuring the thickness of the thin slat. Jeff holding up the first good roof slat only 300 more to go!
By day’s end, the count was nearing 250+ slats. Additional time was taken to clean-up the Woodshop and put away all the tooling and finished slats. The remaining slats will be cut next week. Pictures by Ray Schmid |
Blog AdministrationFind us on FacebookCategory TreeCalendarQuicksearchArchivesSyndicate This Blog |
Powered by s9y.
Comments
Sun, 05-19-2013 22:13
Hello again. I had an idea that was (somewhat rudely, mid-sentence) dismissed in talking to a museum volunteer a few years back, but here it goes [...]
Thu, 05-16-2013 21:52
Looking good Bob! I hope to come out soon once I'm done with school.
Wed, 05-15-2013 21:28
I was not around at the time. General discussion suggests that it was "pretty marginal" in a number of areas. Nigel
Mon, 05-13-2013 11:08
"THUMBS UP!"
Fri, 05-10-2013 02:15
No, it will not be necessary to hold any of the work waiting for the plow to be turned, end for end. Weather will be the major factor, but there will [...]
Thu, 05-09-2013 19:54
The CGW X-38 plow is really coming to life. Bob Kutella and Vic and crew need to be very proud of your collective efforts. I am very appreciative of [...]
Thu, 05-09-2013 15:20
The snowplow looks great! Are you going to apply the door and upper windows befor it is turned to continue work?
Thu, 05-09-2013 09:09
Max, Is there any progress to report yet, in regards to the installation of the poles and overhead wires? Have a good day, sir.
Wed, 05-08-2013 18:40
Thanks for the update! I still don't understand why Commonwealth #5 was removed from service. Do you know why?
Tue, 05-07-2013 09:28
Mr. Kolanowski.....I was just wondering if the Spaulding webcam will be up and running soon for us stay-at-homes. Thanks!2FP
Mon, 05-06-2013 23:04
Max, Has work begun yet on the construction phase of erecting the poles and putting up the wire? Wish I could be there to watch it happen.
Mon, 05-06-2013 23:02
Keep up the good work, Bob. Wish I could be there to help!!!!!!!