Sunday, November 15. 2009
Barn 4 Addition Update, November 14, ... Posted by Robert Kutella
in Buildings and Grounds at
05:10
Comments (0) Barn 4 Addition Update, November 14, 2009IRM volunteers swing into action with Wally Ostopowski and Les Ascher installing cable for telephone service in the new addition. And the contractor was out working on a Saturday. Most of the insulation has been installed in the wall cavities, and they were busy installing plywood sheathing to finish the walls in the soon to be shop area. Sunday, November 15. 2009Light TowerFor some months now, the Building and Grounds Department has been working on an aerial light tower for our parking lot. This has become more important with after dark events like the Terror on the Railroad and the upcoming Holiday Train event. Ray Piesciuk has posted pics in the IRMlist Photo files on Yahoo and Pete Galayda sent me these. The tower was erected last Friday November 12, 2009. If you think it has a railroad 'flavor' you are correct - it was salvaged, moved, reassembled and now installed; having originally served to light a rail yard area. Not real sunny and at times downright windy - but the crew got 'er done! Thursday, November 12. 2009
Barn 4 Addition Update - November ... Posted by Robert Kutella
in Buildings and Grounds at
09:49
Comments (0) Barn 4 Addition Update - November 11, 2009The new floor has been poured and rolls of insulation are waiting. You can determine where steel beams have been embedded in the floor, and outside the wide door opening sits a large stack of plywood sheathing for the interior walls. To get a good image inside where it was dark, the lens had to be opened and so the stack of plywood only appears as a bright smear. Friday, October 30. 2009
Barn 4 Addition Update - October 30, ... Posted by Robert Kutella
in Buildings and Grounds at
10:01
Comments (0) Barn 4 Addition Update - October 30, 2009With thanks to Phil Stepek who has supplied many images which I will display below. He not only made the effort to record the progress, but burned a disk and delivered it to MY HOUSE! I guess I will have to change my address:>). Without further ado, here is what amounts to an entire album of the work over the last two weeks. You will note two freshly poured concrete 'runners' which I believe will serve as footings to next receive railroad rails to allow a truck to be rolled into the new shop. The floor is scheduled to be poured next week. Thursday, October 22. 2009
Barn 4 Addition - October 21, 2009 Posted by Robert Kutella
in Buildings and Grounds at
10:10
Comments (0) Barn 4 Addition - October 21, 2009Thursday, October 15. 2009
New Barn 4 Construction, October 2009 Posted by Robert Kutella
in Buildings and Grounds at
15:53
Comments (0) New Barn 4 Construction, October 2009On October 12, materials began arriving and the contractors set up to build the addition on Barn 4. (See my previous post showing grading work). By Wednesday this week, they were digging the holes for the building support posts, despite light rain, and you can see some of the materials and supplies staged on the ground surrounding the work site. Thursday, September 3. 2009
Groundbreaking News September 2, 2009 Posted by Robert Kutella
in Buildings and Grounds at
04:59
Comments (0) Groundbreaking News September 2, 2009Work has begin on a long planned and much awaited addition to Barn 4. Here Dave Diamond is working to remove topsoil, and by day's end crushed stone was being dumped and spread. This will provide added shop space in line with the old electric car shop and newer wood shop areas. Construction is being paid for through member and friend donations. At this point we only have enough for the slab and building shell, so please consider helping with a donation to add heat, lights, and finish work! Specify Barn 4 Shop Addition for your donation. Saturday, December 27. 2008
Barn 11 Update December 27, 2008 Posted by Robert Kutella
in Barn 11 Construction at
05:08
Comments (0) Barn 11 Update December 27, 2008For those of you playing along at home, and wondering, we have not seen much activity in the last 6 weeks. Nothing discernable from the contractor, and the east end sheathing and doors on both ends still missing. The side light panels on the northwest end are finally in. Before the winter closed in our own B&G guys moved and graded a lot of crushed stone, placed at the base of all the walls. Monday, November 3. 2008
Barn 11 Update November 2, 2008 Posted by Robert Kutella
in Barn 11 Construction at
23:40
Comments (0) Barn 11 Update November 2, 2008With the end of daylight saving time the lighting for these early morning images is less than perfect. But first, you can see the roof panels in place and the ridge vents. The south wall is completely sheathed, including side light panels and the code required 'people doors'. This dark image is of the north wall, about 80% sheathed. There will remain the two end walls to complete before the building contractor is mostly finished. Thursday, October 23. 2008
Roof completed, siding begins ... Posted by Robert Kutella
in Barn 11 Construction at
23:38
Comments (0) Roof completed, siding begins October 22, 2008Sunday, October 12. 2008
Barn 11 Update October 11, 2008 Posted by Robert Kutella
in Barn 11 Construction at
23:36
Comments (0) Barn 11 Update October 11, 2008Thursday, October 9. 2008
Barn 11 Update October 8, 2008 Posted by Robert Kutella
in Barn 11 Construction at
23:34
Comments (0) Barn 11 Update October 8, 2008Thursday, October 2. 2008
Barn 11 Update October 1, 2008 Posted by Robert Kutella
in Barn 11 Construction at
23:33
Comments (0) Barn 11 Update October 1, 2008Sunday, September 28. 2008
Construction continues with truss ... Posted by Robert Kutella
in Barn 11 Construction at
23:30
Comments (0) Construction continues with truss installation September 27, 2008Thursday, September 25. 2008 |
Blog AdministrationCalendar
Category TreeQuicksearchStatisticsLast entry: 2009-11-20 17:11
453 entries written
114 comments have been made
4373 visitors this month
31 visitors today
3 visitor(s) online
Syndicate This Blog |
|||||||||||||||||||||||||||||||||||||||||||||||||
Powered by s9y.

Comments
Fri, 11-20-2009 23:23
Congrats to the IRM. I am from close by South Bend, Indiana and follow the museums workings closely (well as much as I can through internet). [...]
Fri, 11-20-2009 22:40
No, those parcels are owned by Zierer.
Fri, 11-20-2009 20:09
Are the 69.95 and 41.7 acre parcels owned by IRM?
Thu, 11-19-2009 11:25
>CBQ 1309, a baggage car owned by IRM >at least since 2001, has been >located recently. You lost a baggage car? Lucy you need to do some [...]
Thu, 11-19-2009 08:18
As usual, Pete's work is outstanding! Now if we could make some progress on the trucks, so that the car can be finished and operate on a limited [...]
Wed, 11-18-2009 16:39
Could someone please tell me what is going on with the Milwaukee Road 33C E9A in the barn? The last update is a few years old, and my friends and I [...]
Sun, 11-15-2009 22:09
And the B&G Department said, "LET THERE BE LIGHT!" In all honesty, this is one of the important things that we were missing for night time [...]
Thu, 11-12-2009 20:05
Perhaps about 200 of those page views were from this member, hoping that the museum would take advantage of the 50-60 degree November weather and [...]
Tue, 11-10-2009 10:41
I too would like to see more timely information posted on the IRM website regarding new acquisitions like the abovementioned Santa Fe engine, or IRM's [...]
Thu, 11-05-2009 13:05
Thanks for posting pictures and information on Sand Springs 68. Living in Sand Springs, I have only heard my parents talk about riding the street car [...]