Sunday's gang consisted of myself and Tom Hunter. Jeron Glander joined later in the day. Riding off the success at Four Mile Siding last weekend Tom and I prepped tools and material on the crane, flat and caboose combo and headed East to finish building the siding. We didn't waste any time when we got there pulling the storage cars from the siding and using the crane to connect the last two track panels. I realized we had forgotten lock washers to finish bolting them together but all of the joints have a bolt on each side until we can pop a few more in. After finishing off the second panel an investigation into a low oil pressure issue was found to be a hot engine... A little Too hot. It looks like the water pump has failed or the radiator is severely clogged. But with no coolant flow on the top of the radiator it brought our crane use to a severe halt. With the crane shut down Tom and I moved on to spiking up all the remaining ties in the section we had installed the rail in last week. Using track jacks, air compressor and spiking gun we had one entire side spiked up in no time. Prepacked lunch followed in the 529 and then onto spiking the other side.... After restarting the air compressor, without fail, it sputtered off and wouldn't restart. Upon investigation of this issue we figure a bad fuel pump. Fuel in, no fuel out... How about some hand spiking to ease the frustration? Of course! We spiked up the entire other side by hand just in time for Jeron to arrive with the Ballast Regulator. We set the panels in a rough line and Jeron, who reinstalled the rebuilt hydraulic cylinder earlier in the day, plowed stone from the siding into the new track. Getting late in the day we called up for a 'tow' back to the property not risking an engine failure without coolant..and were grateful to see Joel Ahrendt, Warren Lloyd and Kyle Merkel arrive with the ComEd 4 electric steeplecab to help us back. While waiting, Jeron managed to drag nearly enough stone for a first lift on the new track to the very end of track. The end will need somewhere around 12-18" raise but it's very close to complete as is. The 'in service' trackage was officially extended roughly 80' and the last of it will be extended another 80' once we make a good raise and tamp.
The ComEd 4 towed us back to station track 2 for us to access the crane this coming weekend. Thanks for the help guys!
Next weekend we'll dig into the engine issues and hopefully finally have parts for the 6000 tamper to get it running again too. The signal dept plans on setting the new bungalow at East Johnson but with the Burro O.O.S. we will not be able to help as originally planned.
Adam Robillard
Comments
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...
Mon, 12-27-2021 16:28
Happy New Year to all the Departments at the Illinois railway Museum! Thanks for all the good work you do in railroad preservation. Ted Miles, [...]
Wed, 10-13-2021 13:33
Was the CB&Q 1309 every transported to IRM?I’ve been reading old issues of Rail&Wire and the car was mentioned several times.
Mon, 06-07-2021 22:40
I was wondering if in the model layout display what scale would you guys be using and would you be displaying model train history as well? Just [...]
Wed, 06-02-2021 17:27
Nice to see 428's cab back on. Looking forward to when it is operable!
Tue, 06-01-2021 16:47
I hope the work will continue on the UP #428. Now that they are the museum's connection to the national railroad network; she would be very [...]
Sat, 04-17-2021 23:07
What is the status of 126, the Milwaukee Buffet car that is in S. Dakota? Any guess on when or if it will get to IRM?
Wed, 04-14-2021 21:09
Perhaps it is time to scrap the remains of the c, B & Q 7128 to make room for the Villa Real. Ted miles, IRM member
Wed, 04-14-2021 15:26
Hi IRM my name is Jason and I was wonder If you guys would be willing to save a CN Dash8-40cm they are currently being retired by CN and being [...]
Fri, 04-09-2021 19:56
Bear in mind that the Nebraska Zephyr is an articulated train set, so cars cannot be inserted at will. Although cars and/or a second engine could be [...]
Wed, 03-31-2021 11:37
I believe Silver Pony is currently on the back burner, and has been put into storage in one of the barns. The car needs a lot of work done to it's [...]