The second weekend of Thomas and temperatures into the 90's predictably led to a slower work day at the steam shop. However we are now seeing more clearly that work is shifting to the new phase of preparing for reassembly.
On 1630:
· On Monday I met George, the welding specialist from Curtis Boiler, on site and he carried out the welding on the rear tube sheet.
· As mentioned in previous, weeks this was the last critical step to be ready for internal inspection of the boiler by the FRA. With this done, Collin spent Saturday morning cleaning and clearing tools from inside the boiler as well as carefully inspecting all the surfaces for any sign of cracks or damage and polishing any rough edges from the tube holes. We can now advise the inspector that all is ready for inspection and hope that he will be able to fit us into his schedule in the near future.
· Glenn and Richard did some rework on the safe ends for the super heater flues. Inspection on Monday indicated that a couple of these had been cut from tube that was more pitted than desirable so new ones were made ready for welding to the flues in the next couple of weeks.
· A good start was made on cleaning and preparing the nuts and bolts that secure the super heater elements to the header. This is typical of a lot of work that we will be doing in the next few months. These bolts fit into the header at the top of the smoke box so have a tough life, in the path of the exhaust gases from the fire. To remove them required heating to red heat with the acetylene torch. Now they must be thoroughly cleaned, the threads checked and re-cut as necessary, to ensure that they fit and tighten smoothly when we come to fit the elements.
· Vince cleaned and lubricated and number of the flexible stays ends so we are now well on the way thru that process.
· Kevin is back for a few days and continued with needle chipping the exterior of the boiler and support brackets so that we will be able to do a thorough re-paint. He is at Union for several days so this activity will continue during the week.
· Mike continued with test fitting of the patch. This is a very tricky exercise, a sort of three dimensional jigsaw. It looks as if we are now close with this test. Once this is done, we will run thru a second test to prove that the principles developed can be applied reliably to and then we can hopefully produce the patch proper.
· I worked with Tom on preparations for fitting the tubes to the boiler. This is quite a complex, multistage, operation that you will hear a lot more about in the next couple of months!. The first step of the process is to expand the ferrules (copper rings) fitted between the tube and the rear tube sheet into the holes before the swaged tube is fitted. After working with the various sizes of ferrule that we have been sorting and measuring for the last couple of weeks it is clear that we have nowhere near enough of the most commonly required size. We will determine in the next week if we can get ready made ferrules this size in a reasonable time. Otherwise we do have the right size of copper tube and will need to start cutting about 200 of these little rings !!. Good news, it is now clear that, once you know how to match the ferrule size to the hole, the fitting process can be rapid. After all the measuring and testing I was able to fit the first 5 ferrules in no more than 10 minutes. This is likely to be the pattern throughout this operation. We know that years ago re-tubing a boiler was an remarkable fast process. We will have to become familiar with each of the steps and then try to become efficient but accurate at carrying it out.
On 428:
· Machining is speeding up on the axle box thrust bearings. The first one is complete and the second nearly so.
Interesting. The attachment to this box looks quite different from the first. This seems to be a common factor with 428. Each part has been differently repaired at different times.
Nigel
Comments
Sun, 05-19-2013 22:13
Hello again. I had an idea that was (somewhat rudely, mid-sentence) dismissed in talking to a museum volunteer a few years back, but here it goes [...]
Thu, 05-16-2013 21:52
Looking good Bob! I hope to come out soon once I'm done with school.
Wed, 05-15-2013 21:28
I was not around at the time. General discussion suggests that it was "pretty marginal" in a number of areas. Nigel
Mon, 05-13-2013 11:08
"THUMBS UP!"
Fri, 05-10-2013 02:15
No, it will not be necessary to hold any of the work waiting for the plow to be turned, end for end. Weather will be the major factor, but there will [...]
Thu, 05-09-2013 19:54
The CGW X-38 plow is really coming to life. Bob Kutella and Vic and crew need to be very proud of your collective efforts. I am very appreciative of [...]
Thu, 05-09-2013 15:20
The snowplow looks great! Are you going to apply the door and upper windows befor it is turned to continue work?
Thu, 05-09-2013 09:09
Max, Is there any progress to report yet, in regards to the installation of the poles and overhead wires? Have a good day, sir.
Wed, 05-08-2013 18:40
Thanks for the update! I still don't understand why Commonwealth #5 was removed from service. Do you know why?
Tue, 05-07-2013 09:28
Mr. Kolanowski.....I was just wondering if the Spaulding webcam will be up and running soon for us stay-at-homes. Thanks!2FP
Mon, 05-06-2013 23:04
Max, Has work begun yet on the construction phase of erecting the poles and putting up the wire? Wish I could be there to watch it happen.
Mon, 05-06-2013 23:02
Keep up the good work, Bob. Wish I could be there to help!!!!!!!