Wednesday, August 13. 2014
Steam Department Update 08-10-2014 Posted by Nigel Bennett
in Steam Department at
14:50
Comments (4) Steam Department Update 08-10-2014It promises to be a busy few weekends ahead for #1630. We are planned to run both weekends of Day Out With Thomas and then Labor Day weekend. She ran well in recent weeks and I was able to see her in action and take a few pictures when I came for the Vintage transport Sunday. My collection of photographs of her in action is limited as I am normally in the shop when she is running.
There was some pressure to get preparation work done last week / last weekend as it was suggested (as it has been several times before!) that the track contractor would be on site this week preventing #1630 being set on the service track. So a lot of effort went in to #1630 to ensure that everything is ready for three weekends of continuous operation. The first two weekends will be particularly challenging as we need to be out at the depot by 10:00 to clear the way for the Thomas trains. That will require a much earlier start time for the crews. Aside from the usual coaling and watering, the boiler was drained and refilled with fresh water and the locomotive had a good clean. The paintwork was washed and the rods cleaned and oiled.
After all the work she looked a lot better. The dust is gone from the top of the boiler but she is developing a “working” look as the condensation from the safety valves and generator slowly discolors the paint on the firebox sheet metal.
Good news for the firemen is that we have just about reached the end of the old coal and a new supply has been delivered. The large part of what is now in the tender is the new batch. So the hope is that we should be using less and burning better … which would be a big benefit to the firemen on a hot Summer’s day!!. Good thing we believed the story this time!. On Monday the contractor was on-site and hard at work.
By early afternoon the track in front of the boxcar was gone and grading for the switch was progressing fast. Difficult to recognize that this is where #1630 was standing in the previous picture.
If work goes to plan, the switch and much of the cut off track will be in place before next weekend. In the shop continued progress has been made on the Shay. Over successive weeks, the under-side was first thoroughly cleaned by needle chipping and wire brushing. Then mid-week Christian and his brother finished the cleaning and primed all the surfaces. Finally, last weekend Jane put in hours of work in painting the whole area. As the day progressed, it became clear that the overall area was far bigger than it first appeared. There are all sorts of surfaces at different angles and it seemed that whenever she looked from a different angle, there was another area of primer still to be covered. However, after a hard day’s work, she had it pretty much complete. And very nice it now looks. A couple of jobs on the truck and hopefully we can get it back in.
The next couple of weeks may be quiet in the shop as we have intensive running and also the Thomas weekends that keep the site “rather busy”! Nigel Tuesday, August 12. 2014Coach Department UpdateOn Wednesday, August 6th, Kevin Kriebs, Buzz Morisette, and John McKelvey put the Ely dining room table together and put it back in place in the Ely. A big thanks to all who helped! Shelly Vanderschaegen has been cleaning the Ely and putting the dining room back together as time allows. Shelly captured the following images on Sunday, August 10th: It was a beautiful sunny day on Sunday, August 10th. Michael Baksic, Ray Mormann, and Mark Gellman attached seats to the floor in the DM&IR 84. (Sorry no pictures.) Kevin Kriebs has removed all the decal adhesive and began scuffing the exterior of the 1st Exhibit Car using Scotch-Brite™ and a palm sander. It's a mighty big job! Mark hoffmann continued his work in the 2602 sanding areas where he had previously needle chipped. Jon Habegger spent the day with visitor at his post inside the 1st Exhibit Car. John McKelvey continued upholstering Henrietta seats while Shelly Vanderschaegen stripped 4 more seats to be ready for John to epoxy and refinish. The rush is on to finish the seats for the Henrietta in time for the Thomas event. Shelly Vanderschaegen has replaced spring ties in many a bench seat such as this - Photo by Shelly Vanderschaegen Buzz Morisette cleaned windows inside and outside in the Ely and outside the Lake City. After lunch Shelly began vacuuming the Silver cars for visitors next weekend. At the Milwaukee Road Dynamometer, Chuck Trabert replaced the bottom 4” or so of the inside door panel on the bottom door with a new strip of galvanized metal. He then replaced about the same 6” on the outside panel of the bottom north door (no picture shown). Using his metal cutting blade on a circular saw and a straight edge he did a great repair job. These patch pieces were made two years ago by R&B Metal, not knowing when we’d replace them. Warren Newhauser installed the small motor alternator (32VDC to 120VAC at 400 watts) in the electrical locker of the X-5000, after being rebuilt by a local automotive electric shop. This little motor alternator was originally installed to run a small freezer in the office area that would get filled with frozen seafood in Tacoma and distributed to employees in Milwaukee back when the Milwaukee Road ran to the Pacific Northwest. This way the main motor alternator (with high current draw) and Waukesha Enginator would not have to run if the car sat for an extended time. Warren recalled, "I remember my Mother regularly making baked salmon brought back by my Father, who worked on the car." Warren continued: "The motor-alternator successfully hooked up and it works. The ball bearings, which I repacked with wheel bearing grease, or brushes or slip rings seem make a little noise so I’m a bit concerned, but maybe it just needs to break in. The 120V output wires head beneath the car with the thick welding-type cables for the generator and I wasn’t able to figure out where they go so I’ll have to use my RF circuit tracer to find their destination. They should go to the outlet by the office directly across the hallway for the freezer that was there. This will give us a small amount of 120VAC to use for lighting, possibly instruments and the kitchen while the car is in service on a train." Saturday, August 9. 2014
Passenger Car Department Update for ... Posted by Pauline Trabert
in Passenger Car Department at
16:14
Comment (1) Passenger Car Department Update for August 2nd and 3rdMany people to thank... John McKelvey has been totally focused on reupholstering bench seats for the Henrietta, Rock Island coach 2612. He has been working on them daily. John has a lot of skill and experience in upholstery and has made a significant contribution to the Museum with his efforts. Thank you very much John! The Passenger Car Department truly appreciates you! Saturday, August 2nd: Ray Mormann, Mark Gellman and Michael McCraren tested the air brakes on 3 Rock Island coaches in preparation for the upcoming Thomas event. A big thank you to the track department for use of their air compressor! The three men then found a coach step was in need of repair so track 114 became the RIP (Repair In Place) track. They returned from Yard 11 to finish installing the door on the west end of the Birmingham dining car where it connects with the Pacific Peak. The handle is now affixed and the door from the Birmingham to the Pacific Peak is complete - Photo by Michael McCraren Later Mark and Michael McCraren boarded the coach train and repaired windows during a trip. (Sorry no pictures.) Kevin Kriebs has made excellent progress on his project of removing decals and adhesive from the exterior of the 1st Exhibit Car. He continued his efforts on Saturday. Shelly Vanderschaegen began her day with continued cleanup efforts in the Ely after Buzz Morisette completed the dining room ceiling and clerestory work. She vacuumed the car and started putting light shades on the fixtures below the clerestory. The mannequin was put together and put upright in her dining room position, and curtains were put back on the windows. Shelly spent the rest of her work day with John McKelvey working on the Henrietta coach seats project. Jim Windmeier came to IRM to continue the discussion about a potential railroad china display which may go in the 1st Exhibit Car for next season. Mark Hoffmann continued work on the 2602 Rock Island coach. Roger Kramer has put out a call for more volunteers to get this car ready for the upcoming Thomas event. A big thank you to Kevin Brown for taking time to visit the Birmingham diner. Thanks for your continued support! We appreciate you very much. Sunday, August 3rd: Michael McCraren was on train duty on Sunday. Jon Habegger was at his post inside the 1st Exhibit Car chatting with visitors and answering questions about the exhibits currently on display. The Passenger Car Department would like to send out another big thank you to Buzz Morisette for continuing his support in putting the Ely back together. After completing his excellent work on the Ely dining room ceiling, clerestory, and woodwork, he helped clean up and even washed windows! Buzz is one of the really outstanding volunteers at the Illinois Railway Museum with skill, talent, and a helpful nature. Thanks Buzz! Thank you goes out to Wayne Baksic, too, for short notice help with 7700 and Henrietta seats. Thanks Wayne!
|
Blog AdministrationCategory TreeCalendarQuicksearchSyndicate This Blog |
Powered by s9y.
Comments
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...
Mon, 12-27-2021 16:28
Happy New Year to all the Departments at the Illinois railway Museum! Thanks for all the good work you do in railroad preservation. Ted Miles, [...]
Wed, 10-13-2021 13:33
Was the CB&Q 1309 every transported to IRM?I’ve been reading old issues of Rail&Wire and the car was mentioned several times.
Mon, 06-07-2021 22:40
I was wondering if in the model layout display what scale would you guys be using and would you be displaying model train history as well? Just [...]
Wed, 06-02-2021 17:27
Nice to see 428's cab back on. Looking forward to when it is operable!
Tue, 06-01-2021 16:47
I hope the work will continue on the UP #428. Now that they are the museum's connection to the national railroad network; she would be very [...]
Sat, 04-17-2021 23:07
What is the status of 126, the Milwaukee Buffet car that is in S. Dakota? Any guess on when or if it will get to IRM?
Wed, 04-14-2021 21:09
Perhaps it is time to scrap the remains of the c, B & Q 7128 to make room for the Villa Real. Ted miles, IRM member
Wed, 04-14-2021 15:26
Hi IRM my name is Jason and I was wonder If you guys would be willing to save a CN Dash8-40cm they are currently being retired by CN and being [...]
Fri, 04-09-2021 19:56
Bear in mind that the Nebraska Zephyr is an articulated train set, so cars cannot be inserted at will. Although cars and/or a second engine could be [...]
Wed, 03-31-2021 11:37
I believe Silver Pony is currently on the back burner, and has been put into storage in one of the barns. The car needs a lot of work done to it's [...]