Wednesday, December 9. 2015Barns 13 and 14 updateHere is the latest pictorial news concerning barns 13 and 14. The last two weeks a contractor has been working to install all eight new roll-up doors on the eastern end both barns. His work should be completed by the time you read this blog. Next on the schedule is the installation of power and lights to both barns. Max Timms is constructing the main electrical panel here in barn 14. What a professional job. Thanks Max! Want to help make the next barn 15, a reality? Please send your year end donation in and mark it NEW BARN 15 CONSTRUCTION! Thanks Roger Wednesday, November 25. 2015Thankful For A Lot! New Trolley Bus Arrives 11/25/2015.At 10:15am on Wednesday 11/25/2015, Seattle Gillig Trolley Bus 4123 rolled off the truck trailer under its own power! The bus was loaded in Seattle on Saturday afternoon. Thanks to the guys at Extreme Trucking, it safely made the cross-country trip in about 3½ days. As usual, the guys at MEHVA (Metro Employees Historic Vehicle Association) out in Seattle took care of us. They chose a coach that was in great shape and mechanically sound. They also sent along ever critical extra parts.
Our coach has a build date of February 13, 2002. It is exactly 13 years, 9 months and 12 days old. It may very well be the youngest piece of equipment ever to join the museum's historic collection.
We were able to make two test trips and it performed wonderfully. As this is such a new bus, there are a couple things that we are figuring out as we go and we have a couple outstanding questions for the MEHVA guys, but it was great running a bus that could easily still be in service. We are immediately getting busy emptying, cleaning, inspecting and testing the bus and will hopefully have it in service for the Christmas event in a week and a half.
In this season of giving thanks, those involved with this acquisition come to mind. First, thanks to all the guys out in Seattle for arranging this and taking care of the loading. Thanks to the Board of Directors for having the foresight to approve such an exciting new acquisition. As always, a HUGE thank you goes to Richard Schauer. He arranged the trucking and took care of all that was necessary to "de-shippify" the bus once it arrived - putting back all the things that had to be done/undone in order to ship it. Finally, THANK YOU to everyone who has supported the Trolley Bus Department over the years. With the previous acquisitions from MOT in St. Louis and this one, our trucking costs are in the $15,000 range. Even though vehicles are either donated or made available at scrap value, it still costs a considerable amount to transport them to the museum. Your past and continued support allows us to keep working and (hopefully) keep acquiring as exciting opportunities (like this one) arise.
We in the Trolley Bus & Motor Bus Departments wish everyone a wonderful Thanksgiving!!!! Sunday, November 22. 2015
You don't have to be mad .... but ! Posted by Nigel Bennett
in Steam Department at
19:32
Comments (8) You don't have to be mad .... but !
What a difference a few days makes in Illinois!!. In the last few weeks we have been working steadily thru the jobs needed to winterize #1630 and the support equipment while enjoying a long warm Fall. Then this weekend Winter arrived with a vengeance. Small problem, this was the weekend we had a rather critical activity scheduled!!. So, neither rain nor snow etc. (Also you don’t have to be mad to work in the steam shop but it sure helps at times.
The critical activity was the FRA observed hydro test of Shay #5 which was scheduled for Sunday. Clearly large quantities of water do not mix well with temperatures falling into single digits. However we managed.
On Friday Phil managed to fill the boiler and a reserve container in the shop before draining the bottle car that provides our supply of treated water. (Just ahead of the night when temperatures plummeted).
On Saturday I managed to get to the shop between the two bands of snow. Conditions on site were “interesting” and the work team was small.
Difficult to imagine that this was just 7 days after the shot of removing the dome cover from #1630!!. Congratulations to Chris and Jon who made it in. On the Shay the objective was to get the water circulating from the boiler thru the pool heater and then get this fired up so that boiler could be brought up to around 100F and allowed to equilibrate for the test. This was subject to some significant concern as the heater is outside and, should it not operate reliably, there would be a risk of it freezing and damaging the exchanger. Much to my relief, despite digging it out of the snow and having to shield it from further driving snow during the day, it started and ran reliably so the warm up worked well.
Actually, having been used to #1630, it is startling how much quicker #5 warms up and it seems to even the heat out much more effectively because of the relatively short barrel. In the shot above you can see the inlet from the heater feeding into the dome and the return running from the blow down back along the shop to the North.
Sunday was a very pretty day, even if it was 8F when I got back to the shop, and the team could get to the site without problems. The heater restarted without issue and the boiler was ready for testing by mid-morning when the FRA inspector was scheduled. The pressure was raised slowly to 240 psi (125% of the 190 psi at which she will operate). Jason, Phil and Collin worked with the inspector to check parts of the boiler for any sign of leakage but she proved extremely tight. One small area of a seam and the head of one stay will need minor peening but we have an acceptable pressure vessel!!.
This opens up a whole lot more work for the Winter (which is why we were so desperate to get this done before it became impossible to work with water!). The boiler can now be lagged and the various accessories and their pipework fitted. The smokebox riveting should be done soon and then the smokebox can be completed and the truck refitted.
Technically there is no reason that she should not be operational next season. The biggest barrier is MONEY!. The response to the Summer appear was disappointing ($600 plus $600 in matching). Funds for #5 are now low and her operation in 2016 is going to depend heavily on donations in the next few weeks.
So, aside from this weekend, what has been happening in the last few weeks?.
#1630
Work progressed as planned.
#5 – Shay
I am sure that Brian will provide a more detailed update however a lot of progress is apparent leading up to the test today.
#938
Phil and his team completed the Summer work by painting all the wheel and lower areas that have been stripped and primed. She looks a great deal more presentable and will hopefully be able to go under cover once the new barns come into service.
#428
With the cab now riveted, Jon has been working on painting the interior and planning the woodwork that can now be fitted.
Compressor shed
Jeff and Jerry have made huge progress on the pipe work for the new compressors. Max has set up most of the wiring. The smaller of the two compressors is linked in and workable. All the main pipe work for the large compressor, including the cooling loop has been installed. The one remaining item is the flanges to connect the large compressor to the pipework. Once these are made the whole set up should be in a state to test.
Before it can be commissioned a state inspection is required so we cannot put either into operation until the whole set up is complete.
So a busy and successful couple of weeks. Now we head into a busy Winter with the objective of completing two locomotives for next season.
Nigel
|
Blog AdministrationCategory TreeCalendar
QuicksearchSyndicate This Blog |
|||||||||||||||||||||||||||||||||||||||||||||||||
Powered by s9y.
Comments
Mon, 09-08-2025 08:22
Good job on the Burlington Nortern 9976. OK.
Tue, 08-12-2025 12:56
No new news that I have heard of thus far.
Tue, 08-12-2025 12:53
I'll also be doing another update on it soon. Keep en eye out for that.
Tue, 08-12-2025 12:47
A little work was done to it for Diesel Days this year. You'll see photos floating around for the temporary short term job that was done to make it [...]
Wed, 08-06-2025 13:01
Is steam car CN 15444 going to be coming to museum several times it was to be moved to muesum
Sat, 07-19-2025 18:56
Yeah, sadly it's still there as of 7/19/2025
Thu, 06-12-2025 19:14
Its been 14 years guys, where is the unit? Like really? Did you guys misplace it? Or are repairs taking that long? At this point be might we will have [...]
Wed, 04-09-2025 17:40
Jamie Thanks for the update. She's gonna shine like every thing else you guys do! Smeds
Thu, 03-06-2025 16:28
Yes, there is a wye. Those two have been MU'ed on diesel days a year or two ago.
Wed, 03-05-2025 14:04
7009 number boards look good. Is there a way to turn a locomotive around at IRM? In case you ever had a mind to connect 7009 and 6847?
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...