| | | |
|
|
|
|
Rivet test heated - Nigel Bennett (nbennett) Viewed: 1135 times.
|
A lot of tubes ground to size - Nigel Bennett (nbennett) Viewed: 1169 times.
|
Wires for lagging in place on boiler barrel - Nigel Bennett (nbennett) Viewed: 1194 times.
|
Eric takes a break from tube grinding - Nigel Bennett (nbennett) Viewed: 1155 times.
|
| | | |
| | | |
|
|
|
|
Rivets to be fitted - Nigel Bennett (nbennett) Viewed: 1205 times.
|
Two done at the front - Nigel Bennett (nbennett) Viewed: 1161 times.
|
Four complete at the front - Nigel Bennett (nbennett) Viewed: 1186 times.
|
The hot rivet is placed - Nigel Bennett (nbennett) Viewed: 1118 times.
|
| | | |
| | | |
|
|
|
|
Air hammer goes on - Nigel Bennett (nbennett) Viewed: 1140 times.
|
Hammering complete - see how far it is compressed - Nigel Bennett (nbennett) Viewed: 1136 times.
|
The finished rivet head - Nigel Bennett (nbennett) Viewed: 1133 times.
|
Ten in place three to go - Nigel Bennett (nbennett) Viewed: 1152 times.
|
| | | |
| | | |
|
|
|
|
Work starts on the smokebox ring - Nigel Bennett (nbennett) Viewed: 1151 times.
|
Paul works on the smokebox front - Nigel Bennett (nbennett) Viewed: 1238 times.
|
First fittings on the backhead - Nigel Bennett (nbennett) Viewed: 1109 times.
|
Engineer's glass in place - Nigel Bennett (nbennett) Viewed: 1143 times.
|
| | | |
| | | |
|
|
|
|
All rivets in place - Nigel Bennett (nbennett) Viewed: 1184 times.
|
Main control valve for the turret - Nigel Bennett (nbennett) Viewed: 1106 times.
|
Body of the turret valve - Nigel Bennett (nbennett) Viewed: 1093 times.
|
Valve seat in the turret - Nigel Bennett (nbennett) Viewed: 1144 times.
|
| | | |