| | | |
|
|
|
|
But lots still to swage - Nigel Bennett (nbennett) Viewed: 1405 times.
|
Filling the flues to hydro-test - Nigel Bennett (nbennett) Viewed: 1431 times.
|
The other end of the test rig - Nigel Bennett (nbennett) Viewed: 1436 times.
|
Eric and Mark swaging - Nigel Bennett (nbennett) Viewed: 1449 times.
|
| | | |
| | | |
|
|
|
|
Making a swage - Nigel Bennett (nbennett) Viewed: 1394 times.
|
Jerry cleans the swaged ends - Nigel Bennett (nbennett) Viewed: 1399 times.
|
Nancy and Ed loading tubes - Nigel Bennett (nbennett) Viewed: 1526 times.
|
Tube loading gets under way - Nigel Bennett (nbennett) Viewed: 1433 times.
|
| | | |
| | | |
|
|
|
|
You could pay for this sort of exercise at a gym ! - Nigel Bennett (nbennett) Viewed: 1488 times.
|
Collin sets tubes in the fire box - Nigel Bennett (nbennett) Viewed: 1373 times.
|
Many tubes are now loaded - Nigel Bennett (nbennett) Viewed: 1460 times.
|
Jason "relaxes" between tubes - Nigel Bennett (nbennett) Viewed: 1425 times.
|
| | | |
| | | |
|
|
|
|
Fireman's side now loaded - Nigel Bennett (nbennett) Viewed: 1471 times.
|
Engineer's side showing the ferrules - Nigel Bennett (nbennett) Viewed: 1453 times.
|
Loading starts for the day - Nigel Bennett (nbennett) Viewed: 1458 times.
|
Tubes are fed into the front tube sheet - Nigel Bennett (nbennett) Viewed: 1390 times.
|
| | | |
| | | |
|
|
|
|
Matt guides them thru the barrel - Nigel Bennett (nbennett) Viewed: 1449 times.
|
Nigel locates the ends in the rear sheet - Nigel Bennett (nbennett) Viewed: 1400 times.
|
By end of day just 17 gaps - Nigel Bennett (nbennett) Viewed: 1445 times.
|
Little space left in the boiler - Nigel Bennett (nbennett) Viewed: 1504 times.
|
| | | |