| | | |
|
|
|
|
Crown sheet showing stays and front seam - Nigel Bennett (nbennett) Viewed: 1913 times.
|
Firebox side stays - Nigel Bennett (nbennett) Viewed: 1778 times.
|
Removing top of the dome - First slide onto pallet - Nigel Bennett (nbennett) Viewed: 1778 times.
|
Removing top of the dome - The gently lower - Nigel Bennett (nbennett) Viewed: 1673 times.
|
| | | |
| | | |
|
|
|
|
The dome cover - a pretty solid lump of steel - Nigel Bennett (nbennett) Viewed: 1652 times.
|
Brian needle chipping the firebox - Nigel Bennett (nbennett) Viewed: 1695 times.
|
Pipework to be tested - Nigel Bennett (nbennett) Viewed: 1637 times.
|
Firebox seam after sand blasting - Nigel Bennett (nbennett) Viewed: 1690 times.
|
| | | |
| | | |
|
|
|
|
First test bending of the patch - Nigel Bennett (nbennett) Viewed: 1622 times.
|
Rigged for sand blasting - Nigel Bennett (nbennett) Viewed: 1659 times.
|
Sand blasting in progress - Nigel Bennett (nbennett) Viewed: 1644 times.
|
Collin emerges from the boiler - Nigel Bennett (nbennett) Viewed: 1590 times.
|
| | | |
| | | |
|
|
|
|
Rear boiler course now cleaned - Nigel Bennett (nbennett) Viewed: 1682 times.
|
Front tube sheet sheathed for cleaning - Nigel Bennett (nbennett) Viewed: 1658 times.
|
Tubes as recieved back from sand blasting - Nigel Bennett (nbennett) Viewed: 1599 times.
|
Tubes coated with Apexior - Nigel Bennett (nbennett) Viewed: 1601 times.
|
| | | |
| | | |
|
|
|
|
Tube end clean cut for refitting - Nigel Bennett (nbennett) Viewed: 1578 times.
|
Super heater flues still to be clean cut - Nigel Bennett (nbennett) Viewed: 1627 times.
|
Flues now ready for safe ending - Nigel Bennett (nbennett) Viewed: 1612 times.
|
Sand removal - Not pretty but it works! - Nigel Bennett (nbennett) Viewed: 1635 times.
|
| | | |