Sunday, January 13. 2013Wood Shop Update - January 12, 2013The first order of business is to thank all of you for support in my ongoing camera 'crisis'. At least it is a crisis to me. Seven days from now I should be receiving my second new camera; the first is being returned with several problems. Do not buy a camera at discount with a REFURBISHED sticker on the box. Meanwhile thanks for your patience as we both suffer along. The second order of business is to reply to a comment about the electric motor on a tablesaw we are restoring for the shop. If I was able to produce a good photo I would leave it at that. Here is the info from the badge. I read a patent date of March 20, 1894. Since patent rights typically run 14 years, we can be pretty confident this machine is over 100 years old. (There would be little reason to post a patent number which had expired.) General Electric Induction Motor, Type KT 4-5A, 3 Phase, 60 cycle, 220 Volts, 5 HP, 1800 rpm, 13 Amps, Form C. There can be few who do not recognize Randy Hicks. He labors continually for the betterment of our Chicago Aurora and Elgin collection; he is shown here applying the first blue paint to a window of CA&E 36. But he also is a big 'booster' for IRM and works behind the scenes in areas to benefit IRM as a whole. Thanks, Randy. Victor Humphreys makes the final touches in cleaning up three completed NEW windows for our Chicago Great Western X 38. Now, if only the weather were better we could install them at once. We did a lot of 'shop maintenance' tasks in the morning but moved ahead on the project to make two new doors for the CGW X 38. We did the final ripping and sizing of the parts that were rough cut a week or two ago. Rich Witt and Victor are checking how it will look, as we laid the parts in their orientation on the shop floor. These two doors will have wood panels in the bottom half of each one. So, we sized the wood for those, here Victor is stacking and bundling enough parts for four panels. Then we moved on to make more sawdust. In this case we need to make about 60 feet of one half inch radius quarter round molding out of poplar. This is not commercially available so we make our own. We took the cutoffs from previously sized parts, and sawed and planed that to be ready to do the molding profile next. Eric Lorenz is checking rows of interior metal trim parts for the Cleveland Transit System 4223. Finding them would be a great accomplishment in my book. But did we have them all, and how do they fit in the car? We have builders drawings but the parts did not match up. It was sort of like doing a jigsaw puzzle without using the picture on the box. He (and I) were quite pleased when Eric solved the "Mystery at the Museum" and determined that all pieces needed are present and accounted for. Next - help wanted to clean off old paint and rust and get them primed and ready to install. Tim Peters is cleaning out one of the 144 mortises he made this week. Wait I lied, there are really 288 slots that were cut. Four per window times 72 windows, for Chicago Rapid Transit 1024. Meanwhile the Passenger Coach Department continues with work in the shop area. Shelley Vanderschagen is sanding new ceiling panels for the Private Car ELY. Buzz Morisette also makes blocking for the new ceiling in the ELY in the shop. Then hikes to Barn 3 and installs them. So, just yesterday three of our major equipment departments had work going on in the wood shop, at the same time on six projects. Want to help??:
Sunday, January 13. 2013
Steam Department Update 01-12-2013 Posted by Nigel Bennett
in Steam Department at
13:04
Comments (8) Steam Department Update 01-12-2013There was a good deal of progress in the steam shop this weekend. It was a rather shortened day as I attended the Board meeting in the morning and the development of the winter storm had a number of people who live to the North leaving earlier than usual. On 1630: · First priority was that Dennis worked with Mike and Jerry on the corner patch. Completing the patch is the critical path item as we cannot plan even initial hydro testing of the tubes until the boiler is water tight in this area!. A few adjustments were necessary to get the edges to align exactly where Dennis needs them to provide the correct spacing for welding. Once this is complete they will move on to heat the patch in situ in order to finally bend it into the complex shape needed to match the inner firebox. The trick with forming the patch is that it must be formed accurately in 3 dimensions as it must fit not only to the obvious bend around the mud ring but to align with the tubesheet, which is not vertical but slopes forward. · The statistics on tube rolling do not look impressive. We are now about 25% thru rolling the firebox end. However this conceals some critical progress. The time spent rolling tubes was limited as Dennis and the team working on the patch had first call on access to the firebox and the new tube roller will not arrive until the coming week. However, we did manage to roll all the tubes that had been problematic last week. · We do now believe that we have the issue of the "walking" ferrules solved. It seems that, when fitting ferruled tubes at the firebox end, they should not be simply rolled into place. The essential tool is a segmented punch similar to that used to expand the ferrules into place. The difference is that this one has projections that seat on the tube sheet around the tube (to stop it driving the tube forward). When driven by an air hammer, the segments expand with sufficient force to expand the tube. The major difference from the roller is that the punch expands slightly more on the boiler side creating a taper which prevents the ferrule moving forward (the roller would tend to taper the other way encouraging the ferrule to "walk"). Apparently some railroads fitted the firebox ends solely using these punches, normally applied three times to each tube to ensure an even seal. Given that we have the roller, we will now fit the tube with one application of this expander then roll briefly to ensure an even seal. This should be more efficient as the toughest part is getting the punch back out after it has been air hammered into place. · Ed and Phil progressed steadily with the replacement pipe work along the boiler. In other areas · Richard and Bob test wired the new compressor to its control panel. This allowed us to run the motor and compressor briefly and confirm that the electrical supply works as planned. (It should start at a reduced power and then step up to full power after a short delay, which this test proved it is doing correctly.) The reservoir was moved back to the compressor area so, in the next couple of weeks, we should be able to mount the compressor to the floor, fabricate a new air intake filter (as one is missing) and then connect the compressor to the reservoir, which will enable full testing. · Jeff is finalizing the layout for the pipe work and we should get the scissor lift in shortly so that we can start fixing the pipe work into the roof of the shop. · Bob continued with rebuilding the control gear for the planer. No pictures this week as most of what was happening was continuing existing activities (and I was too busy doing the job to photograph the tube expander in operation !!). However significant progress was made on a number of important tasks. Nigel |
Blog AdministrationCategory TreeCalendarQuicksearchSyndicate This Blog |
Powered by s9y.
Comments
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...
Mon, 12-27-2021 16:28
Happy New Year to all the Departments at the Illinois railway Museum! Thanks for all the good work you do in railroad preservation. Ted Miles, [...]
Wed, 10-13-2021 13:33
Was the CB&Q 1309 every transported to IRM?I’ve been reading old issues of Rail&Wire and the car was mentioned several times.
Mon, 06-07-2021 22:40
I was wondering if in the model layout display what scale would you guys be using and would you be displaying model train history as well? Just [...]
Wed, 06-02-2021 17:27
Nice to see 428's cab back on. Looking forward to when it is operable!
Tue, 06-01-2021 16:47
I hope the work will continue on the UP #428. Now that they are the museum's connection to the national railroad network; she would be very [...]
Sat, 04-17-2021 23:07
What is the status of 126, the Milwaukee Buffet car that is in S. Dakota? Any guess on when or if it will get to IRM?
Wed, 04-14-2021 21:09
Perhaps it is time to scrap the remains of the c, B & Q 7128 to make room for the Villa Real. Ted miles, IRM member
Wed, 04-14-2021 15:26
Hi IRM my name is Jason and I was wonder If you guys would be willing to save a CN Dash8-40cm they are currently being retired by CN and being [...]
Fri, 04-09-2021 19:56
Bear in mind that the Nebraska Zephyr is an articulated train set, so cars cannot be inserted at will. Although cars and/or a second engine could be [...]
Wed, 03-31-2021 11:37
I believe Silver Pony is currently on the back burner, and has been put into storage in one of the barns. The car needs a lot of work done to it's [...]