As expected, the completion of the spraying last weekend opened up a frenzy of activity. Work got under way Tuesday and Wednesday once the paint was thoroughly dry. Almost all activity was on 1630 and she now looks a very different locomotive from last weekend. Even so, much of the critical progress is not visible.
On Tuesday and Wednesday work focused on preparing the boiler for hydro testing. This involved fitting the various water connections, valves and gauges to allow the boiler to be completely filled with water and then pressurized.
In addition the large copper pipe, that connects from the top of the firebox to the water column in the cab, had to be refitted. Once all this was done, the boiler was filled and water circulated thru the pool heater to bring the boiler up to around 100F for the pressure testing.
While this was being done Jerry and his son made huge progress in fitting the banding that secures the edges of the sheet metal on the barrel and firebox.
On Wednesday a pressure test was carried out. People have asked why this was necessary as #1630 was hydro and steam tested last year. What is happening now is not a full hydro test of the boiler shell (which requires testing at operating plus 25%) but rather checking for any leaks that may have developed as connections have been separated and remade over the Winter. For this we test only at operating pressure. The test served its purpose!. On Wednesday we found leakage around the connections of the pipe to the water column at both the first test and an attempt to re-seal it.
However, while this was going on, Phil and I made progress in refitting the injector starter valves.
Clearly on Saturday the first priority was to fix the connections of the offending pipe. Eric, Brian and others spent a lot of time thoroughly cleaning the seats and pipe ends of the connections, annealing new copper washers and then carefully re-fitting the pipe. It is a bear to fit as it is long, bent to fit around other equipment and fitted between two rigid seats. So, if it not exactly aligned, the seals at one or both ends do not seat correctly and leak.
Anyway, all the effort paid off and, during the afternoon, she was successfully pressure tested at 180 psi. This allows us to go ahead with the final steps to remove the hydro connections and install the remaining parts needed for operation (safety valves, brick arch etc.).
A lot of other work progressed in parallel with the pressure testing:
The biggest and nastiest job was refitting the two big air tanks under the walkways. These tanks weigh about 300 lbs and are each suspended by three “U” shaped steel rings the open ends of which pass thru the walkways to be secured by nuts.
The fitting is a “masterpiece” of the pipefitter’s art. The tanks must be squeezed into a confined space above the valve gear. The tanks are wider than the walkways so the supports are not simple “U”’s that could be passed around the tank .
Then change in a few days since the picture further up in this note is substantial.
The shape of each support is unique to its location and mixing then up can lead to the need to pull back the tank and start over again!. By evening they were both in place although the frustration during the day had reached considerable heights!.
The job of spotting and making good areas missed in painting continued. A lot more of this will hopefully happen next weekend when we expect to move the locomotive at least a little and reveal areas of the wheels that have so far been hidden.
The fireman’s gauge glass, that has been thoroughly cleaned and rebuilt, was refitted and showed no leakage under pressure.
The injector starter valves and their large connecting pipes were largely re-installed.
Front sander discharge pipes were re-installed.
Work progressed steadily on the smoke box. This is probably the area that most threatens our target to run on May 17th. Dennis, assisted by Christian and Jason completed the adjustment of the new steel sheet sections around the blast pipe. By end of day the sheet sections were being finally installed on to the mountings that had been welded into the smoke box and work was progressing on the mesh sections and the welded mounts that will attach these to the smoke box and complete the spark arrestor assembly.
The unexpected task that may cause a delay is in the smoke box front casting itself. Close inspection of this has indicated hairline cracks between the studs that secure the bell mounting. These will need to be weld filled, ground down and then the holes for the studs re-drilled and tapped before we can remount the front of the smoke box. It will be a busy two weeks.
So, we are close. A couple of key tasks will determine if we can steam in two weeks as planned.
I am away next weekend so will follow the action with great interest!.
Nigel
Thursday, May 1. 2014Second phase underwayJust a quickie update.... Gary began the arduous task of grinding more bolt heads off the north side panels. We will replace these three for they are to rusty to repair. In other words it would look like "H" if we patched them. We figured, since the coach is torn apart we might as well "bite the bullet" and do it!! That will be our focus for the upcoming two weeks; removing panels and rust then priming and painting the "innards." We should be done with this part by May 15 when the new panels will be delivered. Upon arrival they will be again fitted, drilled, and painted before installation. I hope you can see the sparks flying. Gary is again removing the old bolts that hold the rusty panels Thanks to Stan Zoller and reporters, Pauline Trabert and Nigel Bennett, for the first "New" Rail and Wire. I liked the format with larger print for us older folks with "aging" eyes. Great idea! Another great innovation; reporters getting news from all departments.
There are many projects at IRM that never get reported! Thanks Roger Kramer Tuesday, April 29. 20142612 One goal met: 4-19-2014
Yes, all seat frames are reinstalled on the one side!
Gary and I have been working, hard, these last three months to finally reach this goal. That milestone was reached on April 19th. Next, our attention switches to the other side of the coach where almost the exact same repairs will be made. Now we are beginning to remove three rusty panels on the other side. Gary Sherman suggested we buy a new tool. Soooo, we purchased a mini needlechipper. It's a lot lighter and can remove old piant in tight areas. Very useful! Your museum needs your help!!! How would you like to help place RI 2602 back in service? We need volunteers to begin the job of repairing the interior from the winters destruction. It's not to hard but it does take time. If you can't make it out to volunteer Please consider a donation to the Rock Island 2602 fund. Thanks Roger |
Blog AdministrationCategory TreeCalendar
QuicksearchSyndicate This Blog |
|||||||||||||||||||||||||||||||||||||||||||||||||
Powered by s9y.
Comments
Mon, 09-08-2025 08:22
Good job on the Burlington Nortern 9976. OK.
Tue, 08-12-2025 12:56
No new news that I have heard of thus far.
Tue, 08-12-2025 12:53
I'll also be doing another update on it soon. Keep en eye out for that.
Tue, 08-12-2025 12:47
A little work was done to it for Diesel Days this year. You'll see photos floating around for the temporary short term job that was done to make it [...]
Wed, 08-06-2025 13:01
Is steam car CN 15444 going to be coming to museum several times it was to be moved to muesum
Sat, 07-19-2025 18:56
Yeah, sadly it's still there as of 7/19/2025
Thu, 06-12-2025 19:14
Its been 14 years guys, where is the unit? Like really? Did you guys misplace it? Or are repairs taking that long? At this point be might we will have [...]
Wed, 04-09-2025 17:40
Jamie Thanks for the update. She's gonna shine like every thing else you guys do! Smeds
Thu, 03-06-2025 16:28
Yes, there is a wye. Those two have been MU'ed on diesel days a year or two ago.
Wed, 03-05-2025 14:04
7009 number boards look good. Is there a way to turn a locomotive around at IRM? In case you ever had a mind to connect 7009 and 6847?
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...