![]() |
![]() |
Thursday, October 11. 2012
Michigan Electric 28 Update - ... Posted by Ray Schmid
in Michigan Electric 28 at
13:15
Comments (4) Michigan Electric 28 Update - October 7, 2012Rear Roof Slat Installation Completed With the cooler Autumn temperatures comes greater progress in the carbarn. On Sunday, Jeff Brady fired up the roof slat steamer for bending and installing the final slats on the rear of the car. I took a few pictures of Jeff while he was completing this important milestone. The first picture shows Jeff on the rear scaffold holding the cap to the slat steamer pipe. Can you see the slat inside the pipe waiting to be heated by steam? When Jeff thinks the slat has “cooked” enough he quickly removes it and bends it to the correct curvature while nailing it in place. While bending the slat, Jeff hand tapers the bottom end before nailing it to the tack molding. At last the final slat was installed! Can you see Jeff’s finger pointing to the small wedge shaped slat that finished the job? Well done Jeff, the St. Louis Car Company would be proud! After a final sanding of the top layer of slats, Jeff will move on to tackle the front of the car next. I see a lot more slat bending and steaming in Jeff’s future. While Jeff was working on the roof of the car, I was fabricating the first of five window guards for installation in the rear vestibule. We do not have the original window guards as they were probably removed when the car was used as a cottage prior to 1971. We did obtain the correct match for what was there, except the tube lengths are wrong. Therefore, I have disassembled them and am now cutting new tubing to the correct length for reinstallation. The picture below shows the first window guard temporarily installed to check the size and look. I still need to install cold rivets to hold each of the four tubes in place. The window guard will be primed, and painted a finish coat of orange before installation. Interested in the 28 with time on your hands? We are always looking for volunteers to help us finish the car to it's former glory. To join the restoration team, please see us at work on Tuesdays and Sundays in Barn 4/Electric Car Shop. Monetary donations are always welcome. Donations buy the materials, we supply the labor. Mail funds to IRM designating the ME28 restricted fund. Thanks! All pictures taken by Ray Schmid. Additional ME28 pictures can be seen in the IRM Member Photo Gallery @ IRM.org. Tuesday, August 7. 2012
Michigan Electric 28 Update - August ... Posted by Ray Schmid
in Michigan Electric 28 at
08:54
Comments (0) Michigan Electric 28 Update - August 5, 2012More Side Window Replacement and Roof Slat Installation On Sunday, Norm Krentel and Ray Schmid were successful in installing five restored windows into the right rear window openings. Two storm window sashes and two lower sashes were installed along with one interior upper sash. All the wood stops and trim pieces were also screwed in place to hold the windows. The pictures below show the finished upper sash. Side note: Only the interior upper sash contains pressed prism glass that is frosted. The exterior pressed prism glass is clear. The pattern on both windows is identical. The light coming through the newly cleaned prism glass is making these windows appear much more attractive now that the raised arch pattern can be seen. Jeff Brady is shown below nailing the second and final layer of slats over the first. Each basswood slat needs to be hand tapered and fitted so that it will lay flat on the rear curved roof. He is finished with the second layer where the slats will bend without breaking. The side slats on the left and right have such a severe bend that they will break in two or split if they are bent dry. These will require Jeff to treat them with steam until they become more pliable. Once bent and nailed, the steam treated slats will retain their shape after drying. With the 90 to 100 degree weather we are having this summer Jeff is waiting for the weather to cool before using steam in the car barn. I think this is a wise decision! Thursday, August 2. 2012
Michigan Electric 28 Update - August ... Posted by Ray Schmid
in Michigan Electric 28 at
12:30
Comments (2) Michigan Electric 28 Update - August 2, 2012Roof Slat Installation and Side Window Replacement Continues! Jeff Brady is shown below belt sanding the first layer of rear roof mounted wood slats. In the blazing heat this summer, he is nailing the second and final layer over the first. The front and rear will both have two layers of slats that create the contour of the roof. The center carlines of the roof were covered with formed Masonite hard board that has now been painted with a flat black primer. Holes were recently cut by Walt Staffa (not pictured) for the roof vents that will be added following the installation of the canvas roof covering. Shown below is Doug Johnson removing the vent louvers inside the car before Walt cut the holes in the Masonite roof. Norm Krentel continues to disassemble the window sash openings to repair or replace the numerous pieces of wood stops or guides, and metal post caps while the sashes are out for restoration. Upon their return, the sashes are fitted with latches or lifts that will allow the passengers to operate the windows. Several window openings have been completed with the restored windows.
Ray Schmid is shown below installing the latches and lifts to the restored lower sashes. Also shown is Ray’s process for cleaning each pane of ornate upper sash glass before he sets them into the restored frames. There are interior and exterior upper sashes that span a set of two lower sashes. Ray has installed several cleaned panes into the waiting frames. Several of the pressed glass upper sashes have been installed on the car this summer. The press glass exterior upper sashes were painted white while the car was used as a cabin in Michigan and did not allow light to pass into the interior of the car. After paint removal and cleaning, the newly installed sashes make a huge difference in the appearance of the car. The before and after result is amazing! See for yourself in the above pictures in front of Norm.
![]() ![]() ![]() ![]() ![]() |
Blog AdministrationCategory TreeCalendar
QuicksearchArchivesSyndicate This Blog |
Powered by s9y.
Comments
Thu, 03-06-2025 16:28
Yes, there is a wye. Those two have been MU'ed on diesel days a year or two ago.
Wed, 03-05-2025 14:04
7009 number boards look good. Is there a way to turn a locomotive around at IRM? In case you ever had a mind to connect 7009 and 6847?
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...
Mon, 12-27-2021 16:28
Happy New Year to all the Departments at the Illinois railway Museum! Thanks for all the good work you do in railroad preservation. Ted Miles, [...]
Wed, 10-13-2021 13:33
Was the CB&Q 1309 every transported to IRM?I’ve been reading old issues of Rail&Wire and the car was mentioned several times.
Mon, 06-07-2021 22:40
I was wondering if in the model layout display what scale would you guys be using and would you be displaying model train history as well? Just [...]
Wed, 06-02-2021 17:27
Nice to see 428's cab back on. Looking forward to when it is operable!
Tue, 06-01-2021 16:47
I hope the work will continue on the UP #428. Now that they are the museum's connection to the national railroad network; she would be very [...]
Sat, 04-17-2021 23:07
What is the status of 126, the Milwaukee Buffet car that is in S. Dakota? Any guess on when or if it will get to IRM?
Wed, 04-14-2021 21:09
Perhaps it is time to scrap the remains of the c, B & Q 7128 to make room for the Villa Real. Ted miles, IRM member
Wed, 04-14-2021 15:26
Hi IRM my name is Jason and I was wonder If you guys would be willing to save a CN Dash8-40cm they are currently being retired by CN and being [...]