Friday, July 15. 2011
Diesel Days, July 16th and 17th, 2011 Posted by James Kolanowski
in Diesel Department at
07:00
Comments (5) Diesel Days, July 16th and 17th, 2011
The annual Diesel Days Parade of Power won't be quite as large as previous years, but will still be a show that you should not miss. We'll kick off the day at 10:00am with normal operations, the heavyweight coach train pulled by BN1, 2, 3; the Nebraska Zephyr pulled by CBQ 9911A; and a four car caboose train pulled by BN 5383. Later in the day we'll have a few freight train run-bys with different power each time.
The Parade of Power will begin close to 1:00pm and will include the equipment listed below, but not necessarily in this order. A few special items in the parade will include the BN 5383 under load from CNW 6847 heading East, and the CNW 6847 under load from BN 5383 heading West. The same drill for the CBQ 504 under load from SP 1518 heading East, and SP 1518 under load from CBQ 504 heading West. They will not stop in front of the depot as the other trains normally do. - Burlington Northern 1 (EMD F9A), 2 (EMD F9B), 3 (EMD E9A) - Burlington Northern 5383 (GE U30C) - Chicago & North Western 6847 (EMD SD40-2) - Milwaukee Road 760 (FM H10-44) - Southern Pacific 1518 (EMD SD7) - Chicago Burlington & Quincy 504 (EMD SD24) - Chicago & North Western 411 (EMD F7A) Bilevels - Chicago Burlington & Quincy 9911A (EMC E5A) Nebraska Zephyr - Chicago Burlington & Quincy 9255 (EMD SW7) - Commonwealth Edison 15 (EMD SW1) - Nekoosa Paper 14 (ALCO S1) - United States Army 8537 (GE 45Ton) - Wisconsin Central 7525 (EMD SD45MQ-3), Santa Fe 92 (EMD FP45) - Green Bay & Western 2407 (ALCO RSD15) - Illinois Terminal 1605 (EMD GP7) - Chicago & North Western 4160 (EMD GP7R) The line up will be similar on Sunday, except the ATSF 92 will lead the WC 7525 and this consist may pull the coach train in place of BN1, 2 and 3. We'll keep the usual disclaimer of All equipment and schedules subject to change without notice. A night photo session is not scheduled this year. Monday, June 27. 2011
Polishing up on the polishing... Posted by James Kolanowski
in Diesel Department at
23:52
Comments (7) Polishing up on the polishing...
Nebraska Zephyr car "Juno" before cleaning and polishing, although the dirt and grime doesn't show up that well in this photo. The flat panels are a bit different. There is no way we'll have time to get the finish we would like with the machines, so we start with stainless wool, clean the surface with side to side movements only, and then finish off with P21S polishing soap. Again, all of it is by hand. The curves from the letter board up the roof were a little more difficult at first as the corrugation is pretty narrow. On top of that, there is a lot more dirt caked in them from there being a lot more horizontal surface area. The quickest way through the dirt was folded up scotch bright pads and more stainless wool. The same method is being used on the area curving down to the belly pans. So far the Venus, Vesta, and most of Minerva are completed, Juno has been started. Sometime in the next day or two the train will be wyed since it doesn't fit in the shop, let alone the building, and the last two cars will hopefully be completed by the middle to end of next week. Riley, Chris, Pete, Colton, Charlie, Eric, Kevin, the other Kevin, and Jeron have all been pretty busy moving this along quickly. Thank you all for the hard work. We'll post another update in a week or so, along with progress updates of other projects in the shop. Tuesday, March 15. 2011
GB&W 2407 progress Posted by James Kolanowski
in Atchison, Topeka & Santa Fe 841 at
01:29
Comments (11) GB&W 2407 progressThe progress on 2407 continues as a lot of people volunteer their time. We are likely just a few weeks away from being able to start its 2,400HP engine for the first time in over 15 years. About a week ago, Jeron Glander and I finished cleaning out the bottom of the oil filter box of sludge and debris, and installed new oil filters. This past Saturday, Scott Nauer and I cleared track 22 so the Cleveland PCC could be moved out to make room for the next painting project. Once the PCC was moved, we moved the 2407 out of the way so the NSL 714, the next to get a paint job, could go all the way east. We spotted the 2407 after the 714, that way we can move the Alligator in and out as needed without interfering with the work on 714. On Sunday we had Roger Broms, Jim West, Warren Lloyd and myself. The main tasks were to free up the last of the injection pumps that were stuck and drain more contaminated fuel and refill the tank partially. We started on the fuel injection pumps, Warren checked all the ones on the engineers side and made sure they were all still free as they were the last time. There were 4 on the firemans side that were still stuck, or were very sticky to move. The method was to simply work the rack in and out on each, using a block of wood to tap it in, and a bar to slide it back out. Eventually they would move by hand and then after more lubricating and exercise they would return to no fuel with its own return spring as it should. After a few hours of this, we broke for lunch. After lunch we drained another 50 gallons of fuel out of the tank and pumped it into a 55 gallon drum. We spend a little time finding a way to break into the tank to see how much fuel was actually in it. After finding a cover over a 1.5" hole, we found there was about 4 or 5 inches of fuel left in it which we later found out to be about 250 gallons. We began to transfer about 300 gallons of fuel from the 5383 into the 2407. The 5383 and a few other locos had been filled the day before as we decided to stock pile a truck load of fuel for the year while prices were somewhat reasonable. Jim West removed the fuel gauges to see if they were complete and working, both of them had been painted over some time ago. One side had the float rod broken, and the other was complete and working, but it had been sandblasted and painted over, so the glass will need to be changed. Its temporarily back in place without its glass. We spent some time on the fuel pump and relief valve. The way its plumbed is causing some issues with priming the system, we are gonna make a few changes to where the bypass dumps to so this problem can be resolved. We are also looking into changing the fuel filter element to one that is common with other locos that we run. The last few items that we need to work on next time are to add some oil to the engine, during prelubing it is running a little low. We'll need to change the fuel filter type and replumb the fuel relief bypass valve directly to the tank via the existing return lines. We can then move it outside to try to start and idle in order to do some running checks. There is still a long way to go to make it operational, but just getting it started will be one huge accomplishment for everyone. Be sure to visit the Photo Gallery of the current work going on. Also, donations to the RSD15 are still needed and appreciated. |
Blog AdministrationCategory TreeCalendar
QuicksearchSyndicate This Blog |
Powered by s9y.
Comments
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...
Mon, 12-27-2021 16:28
Happy New Year to all the Departments at the Illinois railway Museum! Thanks for all the good work you do in railroad preservation. Ted Miles, [...]
Wed, 10-13-2021 13:33
Was the CB&Q 1309 every transported to IRM?I’ve been reading old issues of Rail&Wire and the car was mentioned several times.
Mon, 06-07-2021 22:40
I was wondering if in the model layout display what scale would you guys be using and would you be displaying model train history as well? Just [...]
Wed, 06-02-2021 17:27
Nice to see 428's cab back on. Looking forward to when it is operable!
Tue, 06-01-2021 16:47
I hope the work will continue on the UP #428. Now that they are the museum's connection to the national railroad network; she would be very [...]
Sat, 04-17-2021 23:07
What is the status of 126, the Milwaukee Buffet car that is in S. Dakota? Any guess on when or if it will get to IRM?
Wed, 04-14-2021 21:09
Perhaps it is time to scrap the remains of the c, B & Q 7128 to make room for the Villa Real. Ted miles, IRM member
Wed, 04-14-2021 15:26
Hi IRM my name is Jason and I was wonder If you guys would be willing to save a CN Dash8-40cm they are currently being retired by CN and being [...]
Fri, 04-09-2021 19:56
Bear in mind that the Nebraska Zephyr is an articulated train set, so cars cannot be inserted at will. Although cars and/or a second engine could be [...]
Wed, 03-31-2021 11:37
I believe Silver Pony is currently on the back burner, and has been put into storage in one of the barns. The car needs a lot of work done to it's [...]