Earlier in the week on Monday morning, Dave Diamond drove the wheelset that was removed from 6847 along with the new motor to a shop just outside of Chicago. They pressed off the wheels and gear, machined the bearing surfaces on the axle, and pressed the gear and wheels back onto the axle and reassembled the combo with new support bearings. Initially there was over .350" of lateral between the old motor and wheels, which is out of tolerance. After the machining and pressing the gear into the correct place and after reassembly with the new motor and bearings, the lateral was .079" where it should be. Dave Diamond helped us out again and picked up the combo on Wednesday morning and unloaded it in the steam shop under the overhead crane.
Saturday morning, Roger Broms, Dan Currens and myself arrived and started to do some other prep work including replacing a broken bolt on the nose pack, and then compressing it to be reinstalled once the motor is back in the truck. The nose pack is basically a rubber pad sandwiched between two thick bars of steel, which supports the nose end of the motor against the truck frame. We also mounted the blower duct and roller bearing boxes and then moved the motor to the drop table.
The Steam Department volunteers helped us out again as well by getting the drop table ready to go and helping get some tools and supplies, as well as operating the crane to stage the combo on the drop table for the installation. The 8537 was used to push the 6847 onto the drop table, centering the #5 axle over the table. The position of the pedestals was marked on the table, and then the table was lowered a bit and moved to the west side of the pit. The centerline for the wheels were marked and then the combo was placed with the nose of the motor blocked up.
The table was lowered and moved back to the east side of the pit under the loco, and raised back up stopping occasionally to check clearances and to line up the roller boxes with the pedestals. We had to push the firemans side wheel over just a bit with a bottle jack to get it to line up exactly in the pedestals, then raised up some more. Eventually the motor nose supports lined up with those on the truck frame and we slid in the support pack and pinned it in, lowered a bit to remove the blocking under the motor, and then continued to raise the table until the springs seated properly over the roller boxes. The table was clamped back into place and the loco was moved back into the shop.
We then put the pedestal cross bars back on, remounted the brake shoes and shock absorbers, released the bolts holding tension on the rubber nose pack, hooked up the traction motor leads and inspected a few other items. After all that, we moved the loco back outside and Jim West helped move the 428 and Shay back into the steam shop.
There is a gallery setup with some random photos during the process of changing the combo, http://www.irm.org/gallery/diesel-november2010, they are mostly in order from the prep work, to removing the wheelset and old motor, to installing the new motor and wheelset. Thanks to everyone that helped during the entire process. Next year when the weather is warmer, we'll test everything out operationally and CNW 6847 will be back in service again.
We seem to be falling into a winter work pattern, with Saturday by far the busiest day in the shop areas inside Barn 4, then Wednesday, and Sunday holding onto third place. So take note that there is more space and less competition for machine time and bench space on the latter two days, if you want to work on your favorite project, or to just show up to watch and help the others.
Jeff Brady is working to glaze the top three openings on a new baggage door for Michigan Electric 28. This is a good cold weather project, when the barn space is really too cold to accomplish a lot. Ray Schmid is in the background painting the retainer beading for the glass.
Bill Moran was on hand and we decided to start the process of planing stock for a new roof on the Los Angeles coach using the planer to reduce the thickness of the new lumber (sawn on Saturday), to the planned 7/16". Here he is removing one of those 16 foot long strips from the outfeed end of the planer.
Comments
Mon, 09-08-2025 08:22
Good job on the Burlington Nortern 9976. OK.
Tue, 08-12-2025 12:56
No new news that I have heard of thus far.
Tue, 08-12-2025 12:53
I'll also be doing another update on it soon. Keep en eye out for that.
Tue, 08-12-2025 12:47
A little work was done to it for Diesel Days this year. You'll see photos floating around for the temporary short term job that was done to make it [...]
Wed, 08-06-2025 13:01
Is steam car CN 15444 going to be coming to museum several times it was to be moved to muesum
Sat, 07-19-2025 18:56
Yeah, sadly it's still there as of 7/19/2025
Thu, 06-12-2025 19:14
Its been 14 years guys, where is the unit? Like really? Did you guys misplace it? Or are repairs taking that long? At this point be might we will have [...]
Wed, 04-09-2025 17:40
Jamie Thanks for the update. She's gonna shine like every thing else you guys do! Smeds
Thu, 03-06-2025 16:28
Yes, there is a wye. Those two have been MU'ed on diesel days a year or two ago.
Wed, 03-05-2025 14:04
7009 number boards look good. Is there a way to turn a locomotive around at IRM? In case you ever had a mind to connect 7009 and 6847?
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...