Wednesday was a very busy day on our snowplow and some major work got accomplished by a very good crew.
While one crew worked on our B&O boxcar (previously reported) the others made progress on the plow. Jim Leonard was up in the bucket truck (Thanks Dave Diamond) and was cleaning rust from the underside of the front plow roof. Dave Rogan was installing the last remaining door threshold on the south side and making plans and measurements for more air piping.
As soon as the boxcar work was done, a train was made up that fans would describe as 'rare mileage'. The consist was certainly rare. The plow was being moved on Track 41 to the east door of Barn 4.
There it is ready for the repair work. Several things were accomplished, as we had hoped they would.
There was a tear in the heavy sheet metal that comprises the plow wedge as it arrived at IRM. Due to some mishap lost to history, but there was a three to four inch rip and resulting hole. The acetylene torch heated the area, and Dave Rogan squeezed his way inside and bent the petals of metal back to close to where they should be. Then our welder took over, stitching it back together and filling the low spots.
Dave Rogan (shown) and Jim Leonard took turns grinding down the weld, and finished up the area including adding prime paint by day's end. We also removed an offending piece of steel strapping up near the roofwalk on the west end, finished making a new piece, and got that installed and bolted in. That allowed us to finish up the last piece of timber framing inside the box, on the west end. Oh, did I mention we also squared up the last window opening on the north side of the body, fit a new window sill, and started on the stop jambs and trim. But wait - there is more.
Also as the plow arrived we noted a half dozen rivets on each side of the ramps had the heads sheared off. There are several ways to suppose how this happened, but it was certainly many years ago. So the torch was used to heat the rivet stubs from below, and a hefty drift pin and sledge hammer punched them out. For now the affected areas are securely bolted up and serviceable.
Comments
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...
Mon, 12-27-2021 16:28
Happy New Year to all the Departments at the Illinois railway Museum! Thanks for all the good work you do in railroad preservation. Ted Miles, [...]
Wed, 10-13-2021 13:33
Was the CB&Q 1309 every transported to IRM?I’ve been reading old issues of Rail&Wire and the car was mentioned several times.
Mon, 06-07-2021 22:40
I was wondering if in the model layout display what scale would you guys be using and would you be displaying model train history as well? Just [...]
Wed, 06-02-2021 17:27
Nice to see 428's cab back on. Looking forward to when it is operable!
Tue, 06-01-2021 16:47
I hope the work will continue on the UP #428. Now that they are the museum's connection to the national railroad network; she would be very [...]
Sat, 04-17-2021 23:07
What is the status of 126, the Milwaukee Buffet car that is in S. Dakota? Any guess on when or if it will get to IRM?
Wed, 04-14-2021 21:09
Perhaps it is time to scrap the remains of the c, B & Q 7128 to make room for the Villa Real. Ted miles, IRM member
Wed, 04-14-2021 15:26
Hi IRM my name is Jason and I was wonder If you guys would be willing to save a CN Dash8-40cm they are currently being retired by CN and being [...]
Fri, 04-09-2021 19:56
Bear in mind that the Nebraska Zephyr is an articulated train set, so cars cannot be inserted at will. Although cars and/or a second engine could be [...]
Wed, 03-31-2021 11:37
I believe Silver Pony is currently on the back burner, and has been put into storage in one of the barns. The car needs a lot of work done to it's [...]