Sunday, January 15. 2012Wood Shop Update - January 14, 2011As seems to be the pattern right now, Saturday seems to be the busiest day in the Barn 4 Shops and there was a lot of activity on many projects. In the previous post we mentioned that a prototype brake shoe had been made using 3D printing, but had no opportunity to get a picture. Lorne Tweed and Alex Randow are examining it closely at the start of the day. What would one of these entries be without WINDOW work? Alex Randow and new volunteer Keith Letsche were hard at work on the aluminum framed sash for Cleveland Transit System 4223. Keith was masking frames as soon as they were cleaned and ready, and Alex applied clear protective finish. As each frame was coated with the clear finish, Alex placed it in this drying rack. I think the count was sixteen at the time I snapped this picture, but the day's work was not done yet. John Faulhaber and Henry Vincent were caught in a strategy meeting, discussing plans for a potential new building on Main Street. We were delighted to welcome Andrea and Ted Anderson (of Pullman Library fame) to our informal lunch table. It is always a treat to hear the stories from two such charming people. Richard Schauer and a few others have been working to restore trolley bases for eventual installation on the CTA 2000 series rapid transit cars. These parts are quite heavy, but Richard paused long enough to let me snap a quick picture. There was work on a number of other projects. Some of the wood work included John Faulhaber, Victor Humphreys, and I completing 36 mortises for a set of new windows we are making, these destined for Illinois Central 3996. And of course the indefatigable Tim Peters continuing on restoration of several doors for the Chicago Rapid Transit 1797. Sunday, January 15. 2012Steam Department Update 1-14-2012A good day of progress on a number of fronts. On 1630 · Success at last on the swager. Tom spent much of last Sunday honing the damaged bores in the dies. We spent most of the morning carefully refitting and aligning them in the machine but it looks like we have success. Several old tubes were successfully swaged and the machine operated smoothly throughout. Now we are ready to go into production. Having gone thru the set up the objective will be to do the tubes for both 1630 and the Shay so between 400 and 500 tubes in total. The current major problem is that all the tubes are in the boxcars and the diesel guys were not able to switch these before the snow arrived. So we are now dependent upon a break in the weather to allow the boxcars to be switched to a position where we can move the large bunches of tubes to and from the shop. What does swaging achieve?. The tubes of a steam locomotive boiler are expanded by rollers into the tube sheets to make the seal. Commonly the tube diameter in the firebox tube sheet is smaller than the general diameter of the tube. This is a crafty piece of steam locomotive design. For efficiency you want as much tube area as you can achieve in contact with the water. The hottest, and therefore most stressed tube sheet, is the firebox end. So narrowing a couple of inches of the tube where it runs into this tube sheet allows more metal to remain in the tube sheet between the holes. So on 1630 (and the Shay) the tubes are 2 inch diameter but are shrunk by swaging to 1 7/8 at the firebox end. The objective of the whole process can now be seen in one of the test tubes.
The process is first to heat the end in a furnace
then hammer it between the dies, that we have had so much fun with, for about 15 seconds turning it as it is hammered so that you get a nice even 1 7/8 inch tube end. · The dome cover was successfully removed to allow lapping of the throttle valve which is one of the key repairs to be carried out. The fork lift made life a great deal easier as the cover could slid directly onto the forks and brought down to the ground. · It is now clear that we have 4 or 5 stays on the back head where the sleeves are sufficiently worn to need replacing so that will start soon. · Mike continued with grinding out the rivet and patch bolt holes to enable fitting of the firebox corner patch. On 428 an number of machining jobs were progressed · Bob and others continued honing the coupling rods to allow new bushes to be fitted; · Stu and Cameron continued with the packing glands; and · Tom and Cameron worked on the set up of a large piece for horizontal drilling. (Looked very impressive but I did not like to disturb the efforts by querying exactly what it was!). Around the shop Jeff continued the program to free up more working areas. · The space is now ready to safe end the super heater flues for 1630 which are coming back from sandblasting in the next week or so; · Some unused machines were moved out of the machine shop which will enable a really challenging move of a large turret lathe from the wheel lathe area to the machine shop. This will allow the turret lathe to be activated and enable wheels to be stored away from the door and overhead crane; · We also lifted the McCabe flanger so that it can be properly mounted on timbers that will allow it to be moved. This will free up space to handle large numbers of tubes that are to be swaged. So another productive weekend. Nigel Sunday, January 15. 2012
Model Railroad Public Display - ... Posted by Robert Kutella
in Model Railroad Display at
05:18
Comments (7) Model Railroad Public Display - January 14 , 2012Those of you who read these entries regularly have seen that IRM has acquired a large model railroad via donation. The concept is to construct a permanent steel framed building along the Main Street alignment and to re-assemble the major components of this layout and to have it open for public display. Model railroads on exhibit during the Thomas Event, for instance, have proved very popular with visitors, and this would serve to add a new and different dimension to any IRM visit. We have spent a lot of time and have developed many CONCEPT sketches and proposals. Here is an example of what the front facade of the new building MIGHT look like. It is pleasing to my eye, but then it would be since I drew it. I would say it is a long shot that the final product would more than resemble this view, but you should quickly get the idea of the potential. I have been informed that at the January 14 meeting, the Board of Directors approved going ahead to the next steps which include fundraising and more detailed plans. We will be getting cost estimates and setting a fundraising goal and we will be contacting potential donors or sponsors for this attraction. In the meantime, a new restricted fund has been set up RMRD to collect and grow the money for this project. Any help in the way of donations, or perhaps of sponsors wishing to participate, or contractors willing to donate at least part of their services IN KIND, please contact me. Together, we can make this happen. |
Blog AdministrationCategory TreeCalendarQuicksearchSyndicate This Blog |
Powered by s9y.
Comments
Mon, 09-08-2025 08:22
Good job on the Burlington Nortern 9976. OK.
Tue, 08-12-2025 12:56
No new news that I have heard of thus far.
Tue, 08-12-2025 12:53
I'll also be doing another update on it soon. Keep en eye out for that.
Tue, 08-12-2025 12:47
A little work was done to it for Diesel Days this year. You'll see photos floating around for the temporary short term job that was done to make it [...]
Wed, 08-06-2025 13:01
Is steam car CN 15444 going to be coming to museum several times it was to be moved to muesum
Sat, 07-19-2025 18:56
Yeah, sadly it's still there as of 7/19/2025
Thu, 06-12-2025 19:14
Its been 14 years guys, where is the unit? Like really? Did you guys misplace it? Or are repairs taking that long? At this point be might we will have [...]
Wed, 04-09-2025 17:40
Jamie Thanks for the update. She's gonna shine like every thing else you guys do! Smeds
Thu, 03-06-2025 16:28
Yes, there is a wye. Those two have been MU'ed on diesel days a year or two ago.
Wed, 03-05-2025 14:04
7009 number boards look good. Is there a way to turn a locomotive around at IRM? In case you ever had a mind to connect 7009 and 6847?
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...