Sunday, March 10. 2013
A little of this..A little of that... Posted by Roger Kramer
in Passenger Car Department at
14:09
Comments (0) A little of this..A little of that...
Saturday was a wet and dreary day BUT, the small Saturday coach group kept plugging away. The projects continued. One, my favorite, as of late, was the R I 2612 and the other was the Ely. Noteworthy on the Ely, was the installation by Buzz and Victor in the afternoon, of the second ceiling panel. Before I could arrive and take a picture Victor had gone home. Instead, here is Buzz along w/ Mark smiling for the camera. Last week, Mike and Ray pulled new wires for the future installation of the two ceiling lite fixture. Look closely at the picture and you will see the new wires protruding from the panels, ready for the "hookup." Not pictured, but equally important, is what the Sunday coach dept crew is working on. Mark, Mike, Shelly and Ray are continueing the painting and upgrading of the second Display Car-Railroad Experience for future Grand opening. On your Spring trip to Irm this year do not forget to visit the display car in yard five. Its quite impressive and beautiful!! My excitement for the day,was the continuation of stripping the 2612 for use in the "Thomas" train this August! I begin by throwing a few boxes left from last week. After lunch,our new member, Brian Patterson, walked in and began the ongoing task of scraping the old paint off the walls. I, in the meantime, unscrewed all of the misc screws on one wall. They were used for xmas displays by the Crandic. I also removed plywood from the nickelseats and placed in positon the nickelseat cushions. By then Mark showed up and assisted Brian in scraping more paint off the walls. The last chore of the day was the transferring of a few of the cushions to my truck in preparation for the removal of the old green upholstery. At that point it was 5 pm and the door were closed for the day! What we need now is help to strip the old green upholstery off of these cushions!! Any assistence would be welcomed!! The coach dept is also appealing for donations to help pay for track storage for the 2612. Please send a donation to the Ristricted Fund, 2612, and when doing so Please consider another to the..................BARN 14 Building Fund. Thank You Roger Kramer
Sunday, March 10. 2013
Steam Department Update 03-09-2013 Posted by Nigel Bennett
in Steam Department at
12:45
Comments (6) Steam Department Update 03-09-2013Thanks to Roger for the update in my absence last week. Having arrived back from the UK Friday, the jet lag made Saturday at the steam shop harder than usual for me !. However the team made good progress in a number of areas despite my preoccupation with what time of the day or night it was. On 1630: · Another milestone in fitting the small tubes. Brian finished rolling the front ends into the smokebox tubes sheet. In the view below you can see all the tubes now fitted and the 16 vacant holes into which we will start fitting the super heater flues; · After grinding most of the firebox ends to the final length for beading, we made a good start on flaring the ends in the firebox. We have to watch carefully to ensure that there is no movement as the tube end is flared and expand the front end a little more if there is any tendency to move but, having worked that out, progress is quite rapid; Here you can see the difference between those higher up, that are now flared, and the ones at the bottom still to be done. The comparison between adjacent tubes E6 and D2 provides a good example. Once this is complete, we can move on to fit the 16 super heater flues and the 9 small tubes that fit between them. · Last week Dennis finished welding the patch into place. A clear demonstration of my limited knowledge of the finer details of welding. It looked pretty complete to me two weeks ago but a further finishing pass and tidying up around some of the rivet holes was still required last week. · The holes have now been reamed for riveting and focus is now on cleaning and servicing the air tools that will be used for forming the rivets. The riveting will be a considerable job as these are substantially the largest rivets we have driven in the shop in many years. · Dave and Phil worked on cleaning and servicing the various control valves from the cab; · Ed continued with the pipe work, which is now getting close to completion There was quite a lot of activity on 428 focused on the leading truck and axle boxes; · Having finished the welding on 1630, Dennis moved on to building up the truck axle boxes. Once built up these will need to be machined and the bearings fitted; · Dave and Phil worked on producing a guide to mount the axle box wedges in the shaper. The wedges must be machined to provide an accurate and consistent angle between the faces. One part of the guide is this tapered block. Here it is being drilled in preparation for mounting on the plate below. The tapered block will be attached to this plate so that the wedge can be locked in position with the angled face on the block. The outer face, against which the axle box will bear, will then be positioned so that is can be planed flat to provide the required angle versus the face within the channel (which bears against the frame). · Mike was working on another mount to hold the shoes in position for mounting on the shaper. In the shop in general, there was a big step forward in the project, funded by the Benefit, to provide piped air supply to the new shop (South end). Jerry had put in several days work during the week and yesterday he and Jeff completed the major parts of the system. After blowing out the debris, valves were fitted on several of the outlets and the system tested for leaks. The system proved air tight and, when I left, Dennis was, for the first time ever !!, working in the fabrication area without 100 feet of hose stretching back into the main shop. This is a substantial improvement as long runs of hose and substantial distance from the operator to the shut off valve have been a safety concern. The next step will be to finish the connection thru the South wall of the shop. This will serve the dual function of providing air for work in the wheel drop area as well as allowing the Sullair to be connected to provide additional capacity without long hose runs. The final step will be to connect in the large compressor. A good day's progress. Hopefully next week I can be there in mind as well as body !! Nigel Thursday, March 7. 2013Wood Shop Update - March 6, 2013We made good progress on the two new doors for Chicago Great Western X 38, all while several other projects proceeded. Jim Leonard is fitting quarter round molding (we made that also in the shop) for the two panels below the window. The panels for all doors were completed earlier and sanded for finish. After the molding to retain the door panels had been fitted, we took them out and Jim Foraker is applying some polyester glazing compound to smooth out and fill in any divots gained during our handling. With panels done and fitted, Jim Leonard has turned to fitting the moldings for the glass window in the top of the door. This pic is of the second door. FINALLY! A picture caption with 'windows' in it! Rich Witt is carefully marking each of the eight pieces for the cuts, at this time the table saw was 'raising' the panels for the CGW doors. Paul Cronin and Rich are making stop cuts in the four stiles for the Boston & Maine round top windows. These are not the typical railroad sash we turn out routinely, so some thought is required. That leaves me out! All of the parts are taking shape for the two round top windows. Rich has laid them out to check dimensions. See how they will go together? Paul Cronin has been cleaning up a very old motor for a new to us old table saw. Finally, there is primer going on. While we were successful in using the Berlin Sander last Saturday, there were a few tell tales that maybe indicated more fine tuning and adjustments could be made. Jim F was pretty deep into that and a quick test showed improvements. Here are Mike Alterio and Frank Sirinek during a rare working visit to the wood shop. For now we will keep that work under wraps. Of course I could not get pics of all the other work. Paul and Dave Diaz cut a number of thin strips or slats of wood for Michigan Electric 28 - these to be used on the curved end roof bonnet on the front of the car. Henry Vincent continued his fine work repairing and end door for Chicago Aurora & Elgin 36. Pete Galayda and John Nelligan made more progress on the seemingly endless task of rebuilding the resistor grid boxes for Charles City Western 300. And we would be remiss not to thank Bobby Knourek of Woodworkers Tool Works. In a short time you would not think possible, Bobby made a set of custom ground knives for new door molding for Chicago Rapid Transit 1024. From the time we sent a sample, to the return of the cutterhead and new knives - LESS THAN ONE WEEK! And the price was right. I suppose I sound like his marketing department but you just do not find that level of service anywhere today, let alone on parts for machines a half century old. |
Blog AdministrationCategory TreeCalendarQuicksearchSyndicate This Blog |
Powered by s9y.
Comments
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...
Mon, 12-27-2021 16:28
Happy New Year to all the Departments at the Illinois railway Museum! Thanks for all the good work you do in railroad preservation. Ted Miles, [...]
Wed, 10-13-2021 13:33
Was the CB&Q 1309 every transported to IRM?I’ve been reading old issues of Rail&Wire and the car was mentioned several times.
Mon, 06-07-2021 22:40
I was wondering if in the model layout display what scale would you guys be using and would you be displaying model train history as well? Just [...]
Wed, 06-02-2021 17:27
Nice to see 428's cab back on. Looking forward to when it is operable!
Tue, 06-01-2021 16:47
I hope the work will continue on the UP #428. Now that they are the museum's connection to the national railroad network; she would be very [...]
Sat, 04-17-2021 23:07
What is the status of 126, the Milwaukee Buffet car that is in S. Dakota? Any guess on when or if it will get to IRM?
Wed, 04-14-2021 21:09
Perhaps it is time to scrap the remains of the c, B & Q 7128 to make room for the Villa Real. Ted miles, IRM member
Wed, 04-14-2021 15:26
Hi IRM my name is Jason and I was wonder If you guys would be willing to save a CN Dash8-40cm they are currently being retired by CN and being [...]
Fri, 04-09-2021 19:56
Bear in mind that the Nebraska Zephyr is an articulated train set, so cars cannot be inserted at will. Although cars and/or a second engine could be [...]
Wed, 03-31-2021 11:37
I believe Silver Pony is currently on the back burner, and has been put into storage in one of the barns. The car needs a lot of work done to it's [...]