There were two very separate activities at the steam shop this weekend.
Outside, the Kansas City Southern tender from Galt arrived and had to be unloaded and put back on its trucks (which had arrived separately during the week). Here the rather unusual trucks of this tender await the arrival of the tender itself.
The tender is a fairly substantial items as can be seen from comparison to the B&G building as it enters IRM for the first time.
A good deal of careful back and fore was required to position the tender (still on the trailer) centrally over the track so that the mounting points would be in the correct position to fit into the trucks.
Once in place steel beams were located under the body. The trailer had then to be raised, blocks placed under the beams, and then lowered a number of times until there was sufficient height to set jacks under the beams.
Finally the jacks were all placed and the tender could be raised off the trailer.
The trailer is free and starts to move out from under the tender.
The trucks are chained to the trailer and each other so that they are pulled under the tender, at the correct spacing, as the trailer pulls out.
The job of lowering the tender back onto its trucks so that the pins aligned and the pivot points located into the sockets in the trucks proved to be a long and tricky exercise. It was well past dark by the time this was completed so pictures of the completed tender are for next week !.
On 1630, things looked bleak in the morning. We are absolutely dependent for tube loading on those of the team who can fit into the boiler. Having arranged a morning and afternoon shift, as it is more than one person can do to work in these conditions all day, Collin's car failed and he was not able to get to Union in the morning. However, while we lost the morning shift, Jason did sterling work in the afternoon. Here we see him "relaxing" between loading tubes. It is not a environment in which you can work for more than a few hours at a time.
We have now completed loading of the tubes down both sides of the super heaters. The fireman's side, looking forward, now looks pretty full compared to earlier views when we were sand blasting.
Looking toward the firebox on the engineer's side also shows the boiler filling rapidly. This also shows the positioning of the copper ferrules, which are set slightly below the surface of the tube sheet in the firebox, where the end of the tube will be beaded, but projecting into the boiler barrel, where the copper can be seen around each of the new tubes.
Mike continued work on drilling the rivet holes in the patch. The accurate alignment of these holes is proving to be a significant challenge.
Nigel
Comments
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...
Mon, 12-27-2021 16:28
Happy New Year to all the Departments at the Illinois railway Museum! Thanks for all the good work you do in railroad preservation. Ted Miles, [...]
Wed, 10-13-2021 13:33
Was the CB&Q 1309 every transported to IRM?I’ve been reading old issues of Rail&Wire and the car was mentioned several times.
Mon, 06-07-2021 22:40
I was wondering if in the model layout display what scale would you guys be using and would you be displaying model train history as well? Just [...]
Wed, 06-02-2021 17:27
Nice to see 428's cab back on. Looking forward to when it is operable!
Tue, 06-01-2021 16:47
I hope the work will continue on the UP #428. Now that they are the museum's connection to the national railroad network; she would be very [...]
Sat, 04-17-2021 23:07
What is the status of 126, the Milwaukee Buffet car that is in S. Dakota? Any guess on when or if it will get to IRM?
Wed, 04-14-2021 21:09
Perhaps it is time to scrap the remains of the c, B & Q 7128 to make room for the Villa Real. Ted miles, IRM member
Wed, 04-14-2021 15:26
Hi IRM my name is Jason and I was wonder If you guys would be willing to save a CN Dash8-40cm they are currently being retired by CN and being [...]
Fri, 04-09-2021 19:56
Bear in mind that the Nebraska Zephyr is an articulated train set, so cars cannot be inserted at will. Although cars and/or a second engine could be [...]
Wed, 03-31-2021 11:37
I believe Silver Pony is currently on the back burner, and has been put into storage in one of the barns. The car needs a lot of work done to it's [...]