Steam Department Update 05-18-2013 Posted by Nigel Bennett
in Steam Department at
19:01
Comments (0) Steam Department Update 05-18-2013It was a productive day at the steam shop leading to a fairly short update. We were able to do what we planned to with no significant setbacks, which is always a good thing to be able to say !. On 1630 the focus was on the tube fitting and the set up for riveting: · The remaining 6 super heater flues were expanded into the front tube sheet. After the problem a couple of weeks back I was in the firebox watching very closely for any sign of movement. But nothing happened. They all rolled into the front sheet with no sign of a slide toward the front. So what happened before .... I have no idea. · With those flues in place we moved on to the last 9 small tubes. These were cut to length, ferrules checked and fitted where necessary, then the tubes were expanded into the rear sheet and rolled into the front. After 180 we are getting quite good at this !. So a big milestone, every small tube is now in place and ready for the water test. · The one remaining tube to be fitted is the large one that had to be cut out two weeks ago. This is being safe ended and will be ready for pressure testing next weekend. We prepared for this by filling the water tank in the back of the truck. A week standing in the sun should have the water warm for use in testing next weekend. If the test is successful, we should be able to fit that last tube immediately. · Mike, Tom and Dennis worked on fabricating a frame that will allow the bucker to be held firmly against each rivet as it is formed. It looks as if we are getting close to the set up for fitting the rivets into the patch, which is the last major step before we can fill the boiler and ensure that the tubes are water tight. Repair riveting is about as difficult as it gets!. When the boiler is made or subject of major repair it is riveted upside down or off the locomotive so you have full access to the mud ring. In this case the trick is to ensure that everything can be placed and held in this fairly confined space. So the area has been cleared ready for riveting and the next stage will be to start setting up the fabricated frame to hold the bucker in place. · Dennis repaired the cinder protection plate on the last of the super heater elements. These simple looking pieces of sheet are most important. When the element is in place in the flue, the pipes bending up to the header are in the path of cinders being sucked thru the flue at great speed, so would be subject to extensive erosion. The rough sheets, wrapped around the element are "sacrifice plates" that suffer the erosion rather than the element itself. The picture was taken prior to the repair and shows how a hole has been cut thru the protector by the abrasive effect of hot, fast moving, cinders. · Tom and Cameron worked on machining the guides required to drill the holes for the new firebox stays. In other areas: · The tubes for the Shay were strapped into bundles and moved back to the boxcar, freeing up the space in the fabrication area; · Tom continued machining the wedges for #428 · Stu worked with Phil and Cameron on sizing the rivets for the cab on #428. This is a job that we will fit in when we have spare resources as it will allow the cab to be refitted freeing up a useful area for fabrication; · Stu also continued work on the control system of the planer; · .... and beside this we were able to assist the US Army (re-enactment version) with the odd bit of metal bashing to keep their tents upright! So overall a good day's work. On a less cheerful note, we talked to Rod, who visited Glen during the week. He remains in the ICU at Rockford Memorial and was heavily sedated. The prognosis remains unclear, particularly with regard to one leg which suffered major damage to the knee. Our thoughts and prayers are with him. Nigel Sunday, May 19. 2013
Coach dept.... Ins and outs Posted by Roger Kramer
in Passenger Car Department at
17:24
Comments (0) Coach dept.... Ins and outs
Here are a couple of updates from the Coach dept rolled into one Blog. First, Mike, Ray, and Mark have been completeing the annual assessments and inspections of the operating coach fleet. This takes about a month to month and one half. They have been checking on the functions of brakes, wheels, and the condition of the trucks. This year upon inspection of the Inglehome's wheels and truck frame it has been determined that one truck has a serious defect and it has been taken out of service. Until this is resolved the observation car will not be operating anymore! Taking into consideration that it is more then 100 years old it will need some Major work to be placed back in service. Another project almost finished by the Sunday crew has been and cleaning and repair of the "Silver train." Last week Mike, Ray, amd Shelly installed the portable A/C units into the various car to keep them "Kool" for the Summer viewing public. More guided tours are on the schedule for this year. A note for you folks who enjoy these cars is the fact that Track Storage Charges have not been paid on the LOCH SLOY! If you would like to help erase this debt Please send a donation to the LOCH SLOY FUND. It owes more than $6,000. Thank You!!! This Spring, one more project has again started up. It's the restoration of the women's bathroom in the John Mcloughlin sleeper. Irm is hosting a convention for the Great Northern RR Historical Society in late July of this year and touring John Mcloughlin is on part of the schedule. This gives the small team of Mark, Brian, and Roger an added incentive to make things happen. Would you like to join us? Just stop by any Saturday in back of Barn #3. Look us up! We'll be there!
Interior and exterior brass sash removed from bathroom of the John Mcloughlin. Waiting restoration in my basement Sunday, May 19. 2013
CGW X38 Update - May 18, 2013 Posted by Robert Kutella
in Chicago Great Western X 38 Russell Snow Plow at
15:10
Comments (0) CGW X38 Update - May 18, 2013Buzz Morisette is up inside the control cab as we try to re-engineer how all the windows, sills, and stops will go together. Note that much of this was totally useless and rotted away. He is holding up one of the original windows for size and placement Before too much dismantling was done to replace the bad parts, Buzz took many pictures to help document the areas. Kind of unusual to find instructions painted on the ceiling - but here it is. Here is an experiment in formatting so you may see the front of the cab by stitching together the three views. The left front view shows faint traces of more lettering; the right front view shows "EMERGENCY VALVE" stenciled in red. Lots of piping, electrical, gauges - most of which will have to be removed to replace the spongy wood behind them.
A lot of the work is now started with removal of the window post and corner posts on the left side. Look closely and you will see the empty mounting holes in the steel members. And what a scenic view out the window! Freight cars, of course - that is our department. This view looks downward at the left front corner. the wood has been removed to the bare steel framing. And another trace at the very top of this image of more lettering and flaky paint - we figured this one out - but not without some headscratching and creative railroad archeology. |
Blog AdministrationCategory TreeCalendarQuicksearchSyndicate This Blog |
Powered by s9y.
Comments
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...
Mon, 12-27-2021 16:28
Happy New Year to all the Departments at the Illinois railway Museum! Thanks for all the good work you do in railroad preservation. Ted Miles, [...]
Wed, 10-13-2021 13:33
Was the CB&Q 1309 every transported to IRM?I’ve been reading old issues of Rail&Wire and the car was mentioned several times.
Mon, 06-07-2021 22:40
I was wondering if in the model layout display what scale would you guys be using and would you be displaying model train history as well? Just [...]
Wed, 06-02-2021 17:27
Nice to see 428's cab back on. Looking forward to when it is operable!
Tue, 06-01-2021 16:47
I hope the work will continue on the UP #428. Now that they are the museum's connection to the national railroad network; she would be very [...]
Sat, 04-17-2021 23:07
What is the status of 126, the Milwaukee Buffet car that is in S. Dakota? Any guess on when or if it will get to IRM?
Wed, 04-14-2021 21:09
Perhaps it is time to scrap the remains of the c, B & Q 7128 to make room for the Villa Real. Ted miles, IRM member
Wed, 04-14-2021 15:26
Hi IRM my name is Jason and I was wonder If you guys would be willing to save a CN Dash8-40cm they are currently being retired by CN and being [...]
Fri, 04-09-2021 19:56
Bear in mind that the Nebraska Zephyr is an articulated train set, so cars cannot be inserted at will. Although cars and/or a second engine could be [...]
Wed, 03-31-2021 11:37
I believe Silver Pony is currently on the back burner, and has been put into storage in one of the barns. The car needs a lot of work done to it's [...]