What a difference a week can make. The Winter still clings on - we left Saturday
evening in falling snow and the shop water supply is still frozen. However, even a couple of days at near normal
temperatures during the week has had a remarkable effect on the snow and ice
around the museum.
For the first time in months, strange parallel lengths of
steel have started to appear from the snow banks. The sound of a diesel locomotive was heard
again as Jamie worked with the track gang to plough key lengths and start the
Spring inspections. A lot catch up is
required on track work delayed by the weather.
Aside from the normal inspections, a large part of the steam collection
is still out by the depot and cannot be moved back until work is completed on
the track and switch leading to the steam lead.
On
1630 work continued steadily
One important effect of the thaw was that we
were able to get to the box car and retrieve the dome cover. While this will not be fitted until the last
minute when the locomotive is outside the shop, we urgently need to prepare it
and spray it at the same time as the boiler so that the finish is the
same. Thanks to Phil who grabbed the
camera and provided a rare shot of Nigel actually doing something as opposed to
standing behind the camera!.
People with paint brushes were all over and
around #1630 and her tender. The
walkways are now largely complete. The
tender truck frames have been done and the sander lines were being touched
up. Irregularly shaped parts like this
generally take about three shots, paint one way up, turnover and paint the
other side, then stand back and spot / touch up the small areas that somehow
did not get painted in either of the previous shots!.
The tender wheels still need to be cleaned
and painted but that is an area which will is seriously impacted by the loss of
water supply, as these need to be pressure washed.
And an update from Jim on Sunday
morning!. The pilot is now completely
painted!.
We are getting close to the point where the
large areas of sheet metal can be sprayed.
Dennis was hard at work welding the weak
spots on the corners of the cab so that these can be finally prepared.
Large areas of the sheet metal have been
rubbed down ready for spraying. After
some thought, areas where bare metal has been exposed are being treated with
sprayed primer. While the epoxy coating
is self-priming, we are finding issues with the bare metal developing a rust
tarnish when left exposed for a week and more.
Since the area is far too large for us to rub down in one day, covering
the areas we have done seems preferable.
In
other areas:
Bob continued work to make the planer fully
operational. He was working primarily on
a pressure switch system that gives the operator an illuminated warning when
the hydraulic system is pressurized. The
picture below gives a much better idea of how this huge machine operates.
The massive “L” shaped cutter assembly can
move vertically on the tower to the right of the moving bed.
At present the cutter assembly is relatively
low. In this position, tools mounted on
the horizontal arm of the cutter assembly would cut the top surface of the
work, while the threaded shaft would advance the cutter horizontally after each
movement of the bed.
The assembly can be raised substantially,
allowing tools mounted on the vertical arm of the “L” to make a vertical
surface on the work. Again a threaded
shaft advances the cutter head after each pass.
I will now be travelling to the UK for a couple of weeks so
will be watching progress with interest from a distance.
Nigel
Comments
Mon, 09-08-2025 08:22
Good job on the Burlington Nortern 9976. OK.
Tue, 08-12-2025 12:56
No new news that I have heard of thus far.
Tue, 08-12-2025 12:53
I'll also be doing another update on it soon. Keep en eye out for that.
Tue, 08-12-2025 12:47
A little work was done to it for Diesel Days this year. You'll see photos floating around for the temporary short term job that was done to make it [...]
Wed, 08-06-2025 13:01
Is steam car CN 15444 going to be coming to museum several times it was to be moved to muesum
Sat, 07-19-2025 18:56
Yeah, sadly it's still there as of 7/19/2025
Thu, 06-12-2025 19:14
Its been 14 years guys, where is the unit? Like really? Did you guys misplace it? Or are repairs taking that long? At this point be might we will have [...]
Wed, 04-09-2025 17:40
Jamie Thanks for the update. She's gonna shine like every thing else you guys do! Smeds
Thu, 03-06-2025 16:28
Yes, there is a wye. Those two have been MU'ed on diesel days a year or two ago.
Wed, 03-05-2025 14:04
7009 number boards look good. Is there a way to turn a locomotive around at IRM? In case you ever had a mind to connect 7009 and 6847?
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...