Another short blog this week and some nervousness!.
Despite significant progress this weekend, the key activity
of spraying #1630 was not undertaken.
This means that the timetable for planned first steaming on the 17th
May is now tight.
The painter identified a number of areas where the preparation was not sufficient and there
was furious activity on Saturday to ensure that all the additional rubbing
down, screwing down of sheet metal and masking made us ready to paint next
weekend. This was done and we now wait with great anticipation for next
Saturday!.
Aside from the preparation for spray painting, good progress
was made in other areas:
The steel work for the spark
arrestor was fitted into the smokebox.
It now fits and the welding to the smokebox sides can now be carried
out. The sheet metal may need to come
out one more time for final adjustment but we are on the final leg. There was much muttering and cursing about
the weight of the new steel that has to be hauled around and carefully
positioned in the enclosed space of the smokebox. It is a LOT heavier than the old steel work
…….. which was 50% corroded away in many places!!.
Christian and Jason did most of the
steel fitting. Christian is actually
taking a break in this shot. The main
work requires crawling up behind the new sheet metal to fit bolts into the
assembly from high up and behind the platework.
Stu, Ed and a team successfully recommissioned
the water supply. This is critical as we
must move forward to hydro test as quickly as we can once the paint is applied.
Jim rubbed down the bell mount and
headlight on Saturday then painted them on Sunday.
The connectors were successfully
removed from the ends of the old (and seriously corroded) steam supply pipe to
the air pump. This was a job with
considerable concerns as the connector at one end is a very old and unusual
type. Separating it, so that it can be
repaired and reused on the new pipe that has been professionally formed to the
correct series of bends, is essential.
There was a significant exposure had this connector been damaged during
removal. However, Tom and Dennis, with
careful use of the “blue wrench”, separated it without damage. This will actually allow it to be
considerably improved as long standing damage can now be corrected by building
up and turning the connector in the lathe.
So. Good progress in several key areas. However, the road to operation will not be
open until the spraying is complete. Then
one helluva lot of jobs will need to be carried out quickly. My fingers are crossed!.
On a different note – Time to start
making plans for this year’s Steam Department Benefit at Sanfilippo. This year's benefit event will take place on
Sunday, June 29. There will be door prizes, as well as a 50/50 raffle
during the benefit event. Time to tour the magnificent Sanfilippo
collection, a concert on the Wurlitzer Theatre Pipe Organ, and a silent film
accompanied live will once again be a part of the benefit event. New this
year will be a special raffle for a CAB RIDE ON 1630! This will be the only
chances to ride in the cab of the restored steam engine!
Tickets (same
price as last year, $69.99 per person) are now on sale and can be obtained by
going to www.irm.org
or by calling the Illinois Railway Museum at (815) 923-4391.
We thank
you for your past support in attending a previous benefit event at the
Sanfilippo Estate, and look forward to seeing you again this year!
Nigel
Comments
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...
Mon, 12-27-2021 16:28
Happy New Year to all the Departments at the Illinois railway Museum! Thanks for all the good work you do in railroad preservation. Ted Miles, [...]
Wed, 10-13-2021 13:33
Was the CB&Q 1309 every transported to IRM?I’ve been reading old issues of Rail&Wire and the car was mentioned several times.
Mon, 06-07-2021 22:40
I was wondering if in the model layout display what scale would you guys be using and would you be displaying model train history as well? Just [...]
Wed, 06-02-2021 17:27
Nice to see 428's cab back on. Looking forward to when it is operable!
Tue, 06-01-2021 16:47
I hope the work will continue on the UP #428. Now that they are the museum's connection to the national railroad network; she would be very [...]
Sat, 04-17-2021 23:07
What is the status of 126, the Milwaukee Buffet car that is in S. Dakota? Any guess on when or if it will get to IRM?
Wed, 04-14-2021 21:09
Perhaps it is time to scrap the remains of the c, B & Q 7128 to make room for the Villa Real. Ted miles, IRM member
Wed, 04-14-2021 15:26
Hi IRM my name is Jason and I was wonder If you guys would be willing to save a CN Dash8-40cm they are currently being retired by CN and being [...]
Fri, 04-09-2021 19:56
Bear in mind that the Nebraska Zephyr is an articulated train set, so cars cannot be inserted at will. Although cars and/or a second engine could be [...]
Wed, 03-31-2021 11:37
I believe Silver Pony is currently on the back burner, and has been put into storage in one of the barns. The car needs a lot of work done to it's [...]