Another short blog this week and some nervousness!.
Despite significant progress this weekend, the key activity
of spraying #1630 was not undertaken.
This means that the timetable for planned first steaming on the 17th
May is now tight.
The painter identified a number of areas where the preparation was not sufficient and there
was furious activity on Saturday to ensure that all the additional rubbing
down, screwing down of sheet metal and masking made us ready to paint next
weekend. This was done and we now wait with great anticipation for next
Saturday!.
Aside from the preparation for spray painting, good progress
was made in other areas:
The steel work for the spark
arrestor was fitted into the smokebox.
It now fits and the welding to the smokebox sides can now be carried
out. The sheet metal may need to come
out one more time for final adjustment but we are on the final leg. There was much muttering and cursing about
the weight of the new steel that has to be hauled around and carefully
positioned in the enclosed space of the smokebox. It is a LOT heavier than the old steel work
…….. which was 50% corroded away in many places!!.
Christian and Jason did most of the
steel fitting. Christian is actually
taking a break in this shot. The main
work requires crawling up behind the new sheet metal to fit bolts into the
assembly from high up and behind the platework.
Stu, Ed and a team successfully recommissioned
the water supply. This is critical as we
must move forward to hydro test as quickly as we can once the paint is applied.
Jim rubbed down the bell mount and
headlight on Saturday then painted them on Sunday.
The connectors were successfully
removed from the ends of the old (and seriously corroded) steam supply pipe to
the air pump. This was a job with
considerable concerns as the connector at one end is a very old and unusual
type. Separating it, so that it can be
repaired and reused on the new pipe that has been professionally formed to the
correct series of bends, is essential.
There was a significant exposure had this connector been damaged during
removal. However, Tom and Dennis, with
careful use of the “blue wrench”, separated it without damage. This will actually allow it to be
considerably improved as long standing damage can now be corrected by building
up and turning the connector in the lathe.
So. Good progress in several key areas. However, the road to operation will not be
open until the spraying is complete. Then
one helluva lot of jobs will need to be carried out quickly. My fingers are crossed!.
On a different note – Time to start
making plans for this year’s Steam Department Benefit at Sanfilippo. This year's benefit event will take place on
Sunday, June 29. There will be door prizes, as well as a 50/50 raffle
during the benefit event. Time to tour the magnificent Sanfilippo
collection, a concert on the Wurlitzer Theatre Pipe Organ, and a silent film
accompanied live will once again be a part of the benefit event. New this
year will be a special raffle for a CAB RIDE ON 1630! This will be the only
chances to ride in the cab of the restored steam engine!
Tickets (same
price as last year, $69.99 per person) are now on sale and can be obtained by
going to www.irm.org
or by calling the Illinois Railway Museum at (815) 923-4391.
We thank
you for your past support in attending a previous benefit event at the
Sanfilippo Estate, and look forward to seeing you again this year!
Nigel
Comments
Mon, 09-08-2025 08:22
Good job on the Burlington Nortern 9976. OK.
Tue, 08-12-2025 12:56
No new news that I have heard of thus far.
Tue, 08-12-2025 12:53
I'll also be doing another update on it soon. Keep en eye out for that.
Tue, 08-12-2025 12:47
A little work was done to it for Diesel Days this year. You'll see photos floating around for the temporary short term job that was done to make it [...]
Wed, 08-06-2025 13:01
Is steam car CN 15444 going to be coming to museum several times it was to be moved to muesum
Sat, 07-19-2025 18:56
Yeah, sadly it's still there as of 7/19/2025
Thu, 06-12-2025 19:14
Its been 14 years guys, where is the unit? Like really? Did you guys misplace it? Or are repairs taking that long? At this point be might we will have [...]
Wed, 04-09-2025 17:40
Jamie Thanks for the update. She's gonna shine like every thing else you guys do! Smeds
Thu, 03-06-2025 16:28
Yes, there is a wye. Those two have been MU'ed on diesel days a year or two ago.
Wed, 03-05-2025 14:04
7009 number boards look good. Is there a way to turn a locomotive around at IRM? In case you ever had a mind to connect 7009 and 6847?
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...