Another good week in which we were able to move a lot forward on 1630.
Various tasks support the overall work plan. First we must finalize preparation for the inspection of the boiler shell. Not much remains to be done to enable this so the next focus is on the tasks that will enable us to make the boiler water tight again. For this, we are preparing all the flues and materials that we need to refit the tubes and also to complete the patching of the firebox. Finally, whenever possible, we work on ensuring that parts that can be fitted once the boiler is watertight and passes its first hydro test are cleaned and ready to be fitted quickly when required.
· During the week Jeff and Jerry managed to complete the cleaning and hydro testing of the super heater elements. The conclusions were good. 24 passed the pressure test at 1000 psi with no issues and are back in the box car ready for refitting when the boiler is ready. 1 passed the pressure test but has some minor damage to the protective shield (a simple sheet metal construction that is wrapped around the element to protect the most exposed areas from erosion by cinders flying thru the flue) and only 2 failed. The last 2 will require the attention of the boiler welding specialist when he comes in to safe end the flues.
· Phil and Collin cleaned up the front tube sheet in preparation for re-tubing.
· Eric did a great job clearing the medium from around the firebox. This is important so that everything is clear and visible for the upcoming inspection. The blasting medium is deceptive stuff!. We knew that there was some still on top of the firebox. The initial comment in the morning was "don't think there's much there". Having used an air line to blow it off the firebox crown and the stays at the sides of the firebox so that it settled into the bottom of the firebox water legs, Eric sucked it out with long pipes on the vacuum cleaner. By end of day we have a clear view along the bottom of all the water legs .......... and probably 80 lbs of medium extracted !.
· After a lot of adjustment to get the settings right the McCabe was used to bend a test sheet for the firebox patch. Past experience with the Shay has demonstrated the importance of proving exactly how the patch will be formed using an old piece of steel before we do it "for real" with an expensive piece of new boiler plate. Considerable progress was made.
The McCabe was used to bend the sheet
........... and the radius formed proved to be an excellent match to the critical curve in the mud ring.
Having been cut to the template, the piece is a pretty good fit to the firebox and can be used to make minor adjustments to the template for the final patch. The next step is to form the piece to fit the slope of the front tube sheet.
· Ed and Jim identified and measured the pipe work to be replaced along the boiler and this can now be ordered.
· Phil, Jeff and I started another job that looks like it will be a lot more "fun" than we had hoped!. A number of the bolts that project from the front ring of the smoke box to secure the smoke box door sheet are wasted and need to be replaced. In theory they can be driven out by hammering them back (towards the boiler). In practice the effect of 60+ years of heat and rust on bolts that were a tight push fit to begin with is "interesting". After 90 minutes of effort with a heating torch and air hammer we have one out. Only another 15 or so to go !!.
· Bob Hunter has now finished the computations and supporting documentation for the form #4 submission. This is the engineering assessment of the boiler which confirms that, having regard both to original design and subsequent wear as now measured, it is suitable for the intended operating pressure. This is now ready for submission.
Nigel
Comments
Fri, 03-29-2024 21:26
We're slackers and spend more time working on the equipment in the shop than keeping all you readers updated. We'll work on it, but I'm sure updates [...]
Thu, 03-14-2024 08:02
What happened to the Department Blog? It's been over 2 years and I still regularly check for updates, but nothing comes...
Mon, 12-27-2021 16:28
Happy New Year to all the Departments at the Illinois railway Museum! Thanks for all the good work you do in railroad preservation. Ted Miles, [...]
Wed, 10-13-2021 13:33
Was the CB&Q 1309 every transported to IRM?I’ve been reading old issues of Rail&Wire and the car was mentioned several times.
Mon, 06-07-2021 22:40
I was wondering if in the model layout display what scale would you guys be using and would you be displaying model train history as well? Just [...]
Wed, 06-02-2021 17:27
Nice to see 428's cab back on. Looking forward to when it is operable!
Tue, 06-01-2021 16:47
I hope the work will continue on the UP #428. Now that they are the museum's connection to the national railroad network; she would be very [...]
Sat, 04-17-2021 23:07
What is the status of 126, the Milwaukee Buffet car that is in S. Dakota? Any guess on when or if it will get to IRM?
Wed, 04-14-2021 21:09
Perhaps it is time to scrap the remains of the c, B & Q 7128 to make room for the Villa Real. Ted miles, IRM member
Wed, 04-14-2021 15:26
Hi IRM my name is Jason and I was wonder If you guys would be willing to save a CN Dash8-40cm they are currently being retired by CN and being [...]
Fri, 04-09-2021 19:56
Bear in mind that the Nebraska Zephyr is an articulated train set, so cars cannot be inserted at will. Although cars and/or a second engine could be [...]
Wed, 03-31-2021 11:37
I believe Silver Pony is currently on the back burner, and has been put into storage in one of the barns. The car needs a lot of work done to it's [...]